Please login if you have access to particular applications.
Search for events by voyage, equipment, action or within comments.
Event count for each voyage, equipment or action is shown in ().
Caveat: this event log was authored on the voyage using either a standalone logging system called ELOG or more recently an inhouse event logging tool called Everlog. For this reason, some positions are unknown and may be resolved using the logged time and the underway dataset for the voyage.
Events ordered by start time:- Click on column header to sort. Use link on 'When' to see full details. Use the CSV button at the bottom to export data.
Survey | When (UTC) | Latitude | Longitude | Instrument | Identifier | Action | Log | Subject / Comments |
---|---|---|---|---|---|---|---|---|
IN2019_E01 | 2019-07-21 09:08 [view ] | SMPS [view] | Maintenance | in2019_e01_Atmospherics | Running overnight zero, starting at measurement 15 or 10:17am | |||
IN2019_E01 | 2019-07-21 10:18 [view ] | CCNC [view] | Maintenance | in2019_e01_Atmospherics | CCN calibration Set-up CCN calibration chassis. Power on CCNC, dry start up mode. All OK. | |||
IN2019_E01 | 2019-07-21 15:00 [view ] | CPC 3772 [view] | Maintenance | in2019_e01_Atmospherics | Annual maintenance Maintenance on the CPC including: - Butanol fill filter replacement, including regeneration of the old filter after ultrasonic bath - Nozzle and OPC clean. Nozzle was pretty clean. OPC had a bunch of white stuff in it which was cleaned out with a Q-tip and water. Noted there was a bit of uneven grease on the o-ring between the column and OPC. - Inspected internal plumbing - all connections were good, and no butanol was in the wrong lines. - Wick was removed and dried overnight in the fume cupboard, reinstalled the next morning all good. | |||
IN2019_E01 | 2019-07-21 15:00 [view ] | SMPS [view] | Maintenance | in2019_e01_Atmospherics | Annual maintenance SMPS maintenance including: - Cleaning the external impactors with kimwipe and alcohol - the nozzle on the impactor (not the preimpactor) may have been installed backwards. See new procedure for proper installation. - Cleaning the impactor at the top of the column with kimwipe and alcohol. - Reapplicaiton of a thin layer of grease to all the impactors - Cleaning of the DMA and all surfaces with kimwipes and alcohol. The DMA itself was very clean, and it was just the sections around the external screws that had a bit of corrosion on them. The brass connections looked reasonable, however one side (presumably the inlet) was dirty on the inside. - Changed the excess air filter with a new one. | |||
IN2019_E01 | 2019-07-22 01:41 [view ] | SMPS [view] | Maintenance | in2019_e01_Atmospherics | Overnight zero check Completed overnight zero check. Total concentrations averaged about 5e-1, with a max of 1.5e0. This is acceptable. | |||
IN2019_E01 | 2019-07-22 02:18 [view ] | SMPS [view] | Maintenance | in2019_e01_Atmospherics | Flow check Gilibrator flow check - 293.1 ccm from 6 points. Only small deviation around this of approx +/- 1 ccm. Goal is 300 ccm, so this is acceptable within 5%. | |||
IN2019_E01 | 2019-07-22 02:20 [view ] | SMPS [view] | Maintenance | in2019_e01_Atmospherics | SMPS operation Leaving SMPS on, measuring lab air, until the PSL cal is performed in a few days. | |||
IN2019_E01 | 2019-07-22 08:59 [view ] | CPC 3772 [view] | Maintenance | in2019_e01_Atmospherics | Zero check started Re-installed instrument after 12M service, positioned next to CCN inlet. Calibrated flows (gilibrator = 999ccm (n=5), Alicat set= 1.000LPM, Alicat read= 1.000LPM) HEPA zero check started 0900hrs UTC. | |||
IN2019_E01 | 2019-07-23 01:17 [view ] | CPC 3772 [view] | Stop | in2019_e01_Atmospherics | Zero check stopped overnight zero check stopped 0120hrs UTC. CPC back measuring lab air. | |||
IN2019_E01 | 2019-07-23 01:50 [view ] | Nephelometer [view] | Maintenance | in2019_e01_Atmospherics | Nephelometer 12 month maintenance including: - Exhaust ball valve cleaning - inlet ball valve was clean, but exhaust ball valve was quite dirty. - Optic cell clean performed - this was quite clean. - Full optical bench clean. A small amount of vac grease was applied to o-rings in optic chamber tubes. - Inspected the exhaust flow DFU - all OK, none replaced. - Batteries were replaced. - Pneumatics were cleaned After reassembly, a leak check was performed - Failed Isolated the external plumbing from the leak test - still failed. Discovered tubing to the pressure sensor was pinched during optic bench reinstallation - test still failed. Found a tube completely disconnected on the output of the zero pump, which means the zero tests for the foreseeable past are crap, but will need to look into the past zeros to verify data quality. This is an inherent problem with the design of these connections. | |||
IN2019_E01 | 2019-07-27 09:12 [view ] | CCNC [view] | Maintenance | in2019_e01_Atmospherics | supersaturation settting I had the CCNc in & 39;manual& 39; SS mode for a few hrs this afternoon. back on auto ss 09:15am | |||
IN2019_E01 | 2019-07-27 09:28 [view ] | -9.1165 | 132.7817 | Techsas1 [view] | Start | in2019_e01 | started acquisition upon entering australian EEZ | |
IN2019_E01 | 2019-07-27 09:28 [view ] | -9.1165 | 132.7817 | Techsas2 [view] | Start | in2019_e01 | started acquisition upon entering australian EEZ | |
IN2019_E01 | 2019-07-27 09:53 [view ] | -9.1415 | 132.8613 | EM710 [view] | Start | GSM_in2019_e01 | Start pinging | |
IN2019_E01 | 2019-07-27 09:54 [view ] | -9.1423 | 132.8638 | EM122 [view] | Start | GSM_in2019_e01 | Start pinging | |
IN2019_E01 | 2019-07-27 10:23 [view ] | -9.1725 | 132.9593 | XBT [view] | Crash | GSM_in2019_e01 | XBT failure- not connecting to hardware- bad connection wire | |
IN2019_E01 | 2019-07-27 11:16 [view ] | -9.2253 | 133.1262 | XBT [view] | Drop | GSM_in2019_e01 | XBT drop after fixed by using splitter at launch connection SST=26.204 | |
IN2019_E01 | 2019-07-27 11:32 [view ] | -9.2415 | 133.1778 | EM710 [view] | SVP | GSM_in2019_e01 | New SVP applied in2019_e01_xbt_001.asvp- start logging | |
IN2019_E01 | 2019-07-27 11:33 [view ] | -9.2420 | 133.1792 | EM122 [view] | SVP | GSM_in2019_e01 | New SVP applied in2019_e01_xbt_001.asvp- start logging | |
IN2019_E01 | 2019-07-27 11:35 [view ] | -9.2445 | 133.1872 | EK60 [view] | Start | GSM_in2019_e01 | Start pinging/logging all frequencies to 1500m using EK80 software | |
IN2019_E01 | 2019-07-27 11:36 [view ] | -9.2450 | 133.1887 | SBP [view] | Start | GSM_in2019_e01 | Start logging | |
IN2019_E01 | 2019-07-27 11:50 [view ] | -9.2597 | 133.2352 | EK60 [view] | Start | GSM_in2019_e01 | All frequencies active- previously recording in passive | |
IN2019_E01 | 2019-07-27 12:28 [view ] | -9.2977 | 133.3560 | EM710 [view] | GSM_in2019_e01 | Testing applying Seapath with same offsets to check for motion artefact | ||
IN2019_E01 | 2019-07-27 14:00 [view ] | -9.3913 | 133.6527 | Gravity Meter [view] | Start | GSM_in2019_e01 | Gravity meter started Air shocks all filled to 30 psi | |
IN2019_E01 | 2019-07-27 14:47 [view ] | -9.4390 | 133.8038 | Gravity Meter [view] | Stop | GSM_in2019_e01 | Gravity meter shut back down- drifting after unclamping and ST tracking on | |
IN2019_E01 | 2019-07-27 15:28 [view ] | -9.4810 | 133.9365 | Gravity Meter [view] | Start | GSM_in2019_e01 | Trying to start gravity meter again | |
IN2019_E01 | 2019-07-27 21:42 [view ] | -9.8583 | 135.1333 | ADCP [view] | in2019_e01 | Stop logging for multibeam noise test while slowing for seismic deployment | ||
IN2019_E01 | 2019-07-27 21:43 [view ] | -9.8592 | 135.1358 | EM710 [view] | Stop | GSM_in2019_e01 | All acoustics stopped for noise testing em's | |
IN2019_E01 | 2019-07-27 22:18 [view ] | -9.8755 | 135.1897 | EM710 [view] | GSM_in2019_e01 | All acoustics back on following noise tests | ||
IN2019_E01 | 2019-07-27 22:20 [view ] | -9.8760 | 135.1908 | ADCP [view] | in2019_e01 | Start | ||
IN2019_E01 | 2019-07-27 23:34 [view ] | -9.8958 | 135.2510 | SMPS [view] | Maintenance | in2019_e01_Atmospherics | Flow check Gilibrator flow check at inlet - 0.280 LPM | |
IN2019_E01 | 2019-07-27 23:37 [view ] | -9.8970 | 135.2548 | Underway Seawater Data | Start | in2019_e01 | Underway Data Collection Started - optode 662 installed coefficients updated IAW .xls file | |
IN2019_E01 | 2019-07-27 23:39 [view ] | -9.8977 | 135.2572 | Other [view] | Start | GSM_in2019_e01 | Start logging qinsy for seismic trials | |
IN2019_E01 | 2019-07-28 00:16 [view ] | -9.9117 | 135.3018 | EM710 [view] | SVP | GSM_in2019_e01 | New SVP in2019_e01_sst_002.asvp applied | |
IN2019_E01 | 2019-07-28 00:36 [view ] | -9.9207 | 135.3300 | SMPS [view] | Maintenance | in2019_e01_Atmospherics | butanol filled and emptied | |
IN2019_E01 | 2019-07-28 01:50 [view ] | -9.9438 | 135.4037 | EM710 [view] | SVP | GSM_in2019_e01 | New SVP in2019_e01_sst_003.asvp applied | |
IN2019_E01 | 2019-07-28 02:16 [view ] | -9.9538 | 135.4350 | SMPS [view] | Fault | in2019_e01_Atmospherics | Condenser temperature not reaching setpoint Butanol ran out (error 40) overnight. I refiled it and the signal came back good but error 32 is persisting (temperatures not reaching setpoint). I tried restarting the software and running the warmup, but the condenser temperature is not reaching the setpoint (10oC), and only making it to 14oC. I power cycled the instrument, leaving it off for about 30 minutes, then unplugging it from mains power for about 1 minute, before restarting (without the software). Checked about 45 min later, and the condenser temperature is down to 11.8oC. Leaving it for a while longer to see if it gets down to temperature. Left another 45 min, temperature hasn& 39;t gone any further down. Took cover off to inspect plumbing, nothing suspicious, but the air conditioner is blowing directly on the instrument - maybe the heater dump for the temperature isn& 39;t able to work against the 21oC AC. I& 39;ve readjusted the AC flow direction flaps to point directly out, rather than down as they were. No change after 15 minutes. It could be related to the humidity or some dodgy butanol - I& 39;ve connected the diffusion drier to the inlet (still sampling lab air) to test the humidity effect. No change. Leaving overnight to see if the wick wetting is the issue (removed the diffusion drier). | |
IN2019_E01 | 2019-07-28 02:24 [view ] | -9.9570 | 135.4448 | MAAP [view] | Maintenance | in2019_e01_Atmospherics | Annual maintenance Opened up optics to discover the reflection optics are very soiled (see attached image) Need to fully disassemble optics to clean out properly in an IPA bath. The transmission optics have been discovered to be quite dirty as well.(see attached image) Removal of the stage has discovered that silicon has been applied in a poor manner to keep a seal on, but this has overflowed to stick the stage on in the back left corner. Cleaned up and removed this excess silicon. Removed the "O-ring" seal, and brass shim surrounding the transmission optics. Can& 39;t remove the transmission optics itself, so we& 39;re cleaning it in place with canned IPA and Q-tips making sure to clean the diode surfaces too. Cleaning the reflection optics in a bath of IPC and agitating Disassembling all the transmission optics and fully cleaning in ultrasonic bath, lots of rust everywhere. After cleaning, discovered some of the matte black paint on the stage has been removed - this puts into question the quality of the data going forward. Need to check data going forward. After full cleaning in bath, and rust removal with glass fibre pen and lots of q-tips, everything looked good. But after a while in the oven, Ian discovered liquid still in the reflection optics head. We took it apart a bit more to remove the excess water and while apart, put it in the oven for a few more hours. | |
IN2019_E01 | 2019-07-28 02:48 [view ] | -9.9658 | 135.4732 | EK60 [view] | Other | GSM_in2019_e01 | Calibration values added to ek80 software | |
IN2019_E01 | 2019-07-28 03:57 [view ] | -10.0010 | 135.5862 | Air Sampling Pump | Maintenance | in2019_e01_Atmospherics | would not start - cleaned Pump would not start. Inspection found it filthy inside. I cleaned it really thoroughly, reassembled, and now it works | |
IN2019_E01 | 2019-07-28 03:59 [view ] | -10.0023 | 135.5903 | Air Sampling Pump | Start | in2019_e01_Atmospherics | started - frequency adjusted Flow rate measured 350LPM on restarted following maintenance. Normal flow rate 420LPM frequency adjusted (from 30Hz, to 36Hz). Flow now 420LPM | |
IN2019_E01 | 2019-07-28 04:01 [view ] | -10.0047 | 135.5977 | Air Sampling Inlet Flowmeter | Start | in2019_e01_Atmospherics | Started following dry dock | |
IN2019_E01 | 2019-07-28 04:03 [view ] | -10.0067 | 135.6043 | Air Sampling Inlet Flowmeter | Start | in2019_e01_Atmospherics | Started following dry dock | |
IN2019_E01 | 2019-07-28 04:57 [view ] | -10.0657 | 135.7915 | CCNC [view] | Change | in2019_e01_Atmospherics | CCNc supersaturation SS set to manual mode 04:57UTC hrs | |
IN2019_E01 | 2019-07-28 05:16 [view ] | -10.0858 | 135.8555 | EM122 [view] | SVP | GSM_in2019_e01 | New SVP in2019_e01_sst_004.asvp applied | |
IN2019_E01 | 2019-07-28 05:17 [view ] | -10.0863 | 135.8572 | EM710 [view] | SVP | GSM_in2019_e01 | New SVP in2019_e01_sst_004.asvp applied | |
IN2019_E01 | 2019-07-28 05:52 [view ] | -10.1250 | 135.9800 | Nephelometer [view] | Maintenance | in2019_e01_Atmospherics | Running overnight zero, starting at 05:50am UTC | |
IN2019_E01 | 2019-07-28 06:38 [view ] | -10.1743 | 136.1368 | CCNC [view] | Change | in2019_e01_Atmospherics | supersaturation settting changed back to auto mode 06:30hrs | |
IN2019_E01 | 2019-07-28 06:42 [view ] | -10.1790 | 136.1513 | SMPS [view] | Fault | in2019_e01_Atmospherics | Power cycled the instrument to try to get condenser temp to set point This helped it get down to 11.2oC now after 45 minutes. Power cycling again to see if I can get it that little bit further! | |
IN2019_E01 | 2019-07-28 21:02 [view ] | -11.0430 | 138.8995 | EM710 [view] | SVP | GSM_in2019_e01 | New SVP in2019_e01_sst_005.asvp applied | |
IN2019_E01 | 2019-07-28 21:51 [view ] | -11.0927 | 139.0580 | CCNC [view] | Change | in2019_e01_Atmospherics | Zero check and SS HEPA zero check 09:45- 09:50pm switched to manual SS 09:53hrs for todays SS calibration. | |
IN2019_E01 | 2019-07-29 00:01 [view ] | -11.1717 | 139.4788 | SMPS [view] | Fault | in2019_e01_Atmospherics | Condenser temperature still out of range Came in in the morning to find the condenser temperature at 15 degrees. The software has been having trouble connecting, so maybe this is a standby mode feature? I have restarted the instrument and the PC to see if I have any luck. | |
IN2019_E01 | 2019-07-29 00:30 [view ] | -11.1552 | 139.5783 | pCO2 [view] | error | in2019_e01 | Reference gas cylinders were not open until now An oversight on my behalf, the gas bottles were not opened from when the underway system was started until now. | |
IN2019_E01 | 2019-07-29 00:49 [view ] | -11.1443 | 139.6438 | Underway Seawater Data | Maintenance | in2019_e01 | Dosing Pump install was tested with the underway line & 39;dosed& 39; with approximately 10L of 10% Fresh water over apprximately 10 minutes. | |
IN2019_E01 | 2019-07-29 01:27 [view ] | -11.1222 | 139.7778 | SMPS [view] | Fault | in2019_e01_Atmospherics | Condenser temp I& 39;ve pulled the SMPS out in order to dry the wick. Disconnected the DMA to pull it out. Taken it to dry lab. Disconnected the CPC (lots of cables!) and removed it (4 screws underneath) and relocated the CPC to the fume hood. Removed the top cover of the optics, one of the tiny circuit boards blocking one of the screws for the front plate, then removed the front plate and foam, removed the inlet protecting the saturator block and then removed the wick with tweezers. The wick is a slightly yellow colour, not sure if it was originally white or what, but it may be discoloured. Leaving in the fume hood for the day. Might put in the oven overnight to drive the last bit of the water out. | |
IN2019_E01 | 2019-07-29 05:11 [view ] | -10.9952 | 140.5470 | CCNC [view] | Change | in2019_e01_Atmospherics | supersaturation settting changed SS to deltaT = 14.0 (SS=0.97) at 05:10hrs | |
IN2019_E01 | 2019-07-29 05:27 [view ] | -10.9867 | 140.5987 | MAAP [view] | Observation | in2019_e01_Atmospherics | filter tape filter tape damaged on left hand side (new side)? swiching instrument off until someone can fix it. | |
IN2019_E01 | 2019-07-29 05:51 [view ] | -10.9728 | 140.6818 | MAAP [view] | Maintenance | in2019_e01_Atmospherics | Fixed filter tape damage Stopped MAAP, opened up the head, cut out the damaged filter tape and taped the two parts together and wrapped it around a few times. Looks good now. Currently zeroing. | |
IN2019_E01 | 2019-07-29 08:42 [view ] | -10.8602 | 141.2643 | Picarro Spectrometer [view] | Start | in2019_e01_Atmospherics | Picarro started, calibrated, running monitor runs I have reinstalled the Picarro following dry dock. I have run calibrations for over 3 hours, and now runnning monitor runs | |
IN2019_E01 | 2019-07-29 10:18 [view ] | -10.7607 | 141.5847 | MAAP [view] | Outage | in2019_e01_Atmospherics | Restarted to clear error after switching from manual mode. | |
IN2019_E01 | 2019-07-29 10:20 [view ] | -10.7585 | 141.5920 | Nephelometer [view] | Maintenance | in2019_e01_Atmospherics | Zero check stopped, started back on ambient | |
IN2019_E01 | 2019-07-29 10:21 [view ] | -10.7577 | 141.5947 | Change | in2019_e01_Atmospherics | CPC and SMPS taps were open for the past few days. Closed them now, so no longer sampling lab air. | ||
IN2019_E01 | 2019-07-29 10:23 [view ] | -10.7560 | 141.5998 | CCNC [view] | Maintenance | in2019_e01_Atmospherics | CCN cal finished, set back to auto sampling, connected back up to main inlet CCN tap was also open, so this is now the start of proper ambient sampling on that line. | |
IN2019_E01 | 2019-07-29 10:32 [view ] | -10.7460 | 141.6315 | Fluorometer [view] | Cleaned | in2019_e01 | ||
IN2019_E01 | 2019-07-29 20:16 [view ] | -9.7960 | 143.1838 | EM710 [view] | SVP | GSM_in2019_e01 | New SVP in2019_e01_sst_006.asvp applied | |
IN2019_E01 | 2019-07-29 23:57 [view ] | -9.3263 | 143.7108 | CCNC [view] | Change | in2019_e01_Atmospherics | supersaturation settting SS setting control was still in & 39;manual& 39; mode, after yesterdays calibration (SS= 0.09%, Dt= 3.0). Switched to Auto SS 12:00am UTC | |
IN2019_E01 | 2019-07-30 00:02 [view ] | -9.3165 | 143.7260 | CPC 3772 [view] | Observation | in2019_e01_Atmospherics | 3772 Alicat MFC Alicat remote screen off/not working? Any keypad press does not activate it. So cannot confirm flows. Is it going into a sleep mode? | |
IN2019_E01 | 2019-07-30 01:02 [view ] | -9.2247 | 143.8993 | Nephelometer [view] | Maintenance | in2019_e01_Atmospherics | Added missing insulation to inlet pipe that was missed during servicing. | |
IN2019_E01 | 2019-07-30 01:04 [view ] | -9.2252 | 143.9088 | pCO2 [view] | in2019_e01 | Adjusted flow rate from STD4 | ||
IN2019_E01 | 2019-07-30 01:38 [view ] | -9.2322 | 144.0270 | EM710 [view] | SVP | GSM_in2019_e01 | New SVP in2019_e01_sst_007.asvp applied | |
IN2019_E01 | 2019-07-30 03:22 [view ] | -9.3438 | 144.3692 | Aerosol Manifold [view] | Maintenance | in2019_e01_Atmospherics | Air port open for last 20mins | |
IN2019_E01 | 2019-07-30 03:43 [view ] | -9.4027 | 144.4167 | MAAP [view] | Change | in2019_e01_Atmospherics | BC concentration unit Changed displayed [BC] units from ug/m3 to ng/m3 at 03:45am UTC. The displayed concentration on the front screen was constantly 0.00 ug/m3. Post-change [BC] = 17ng/m3. | |
IN2019_E01 | 2019-07-30 04:06 [view ] | -9.4642 | 144.4663 | SMPS [view] | Maintenance | in2019_e01_Atmospherics | PSL cal at 303 +/- 6 nm started Condenser temperature at 18.2oC (set point of 10oC). | |
IN2019_E01 | 2019-07-30 04:14 [view ] | -9.4860 | 144.4840 | SMPS [view] | Maintenance | in2019_e01_Atmospherics | PSL cal at 100 +/- 3 nm started | |
IN2019_E01 | 2019-07-30 04:17 [view ] | -9.4860 | 144.4840 | SMPS [view] | Maintenance | in2019_e01_Atmospherics | PSL cal at 508 +/- 8 nm started | |
IN2019_E01 | 2019-07-30 04:21 [view ] | -9.4860 | 144.4840 | SMPS [view] | Maintenance | in2019_e01_Atmospherics | PSL cal at 81 +/- 3 nm started | |
IN2019_E01 | 2019-07-30 04:21 [view ] | -9.5032 | 144.4978 | Nephelometer [view] | Maintenance | in2019_e01_Atmospherics | Temperature, BaroPress, RH sensor calibration Audited sample temperature, Barometric pressure, and sample RH sensors against external probes (about 2hrs ago). All passsed, no adjustment performed. Parameter Nephelometer Calibrated reference Temperature 25.69 26.34 Rel Humidity 44.775 44.93 Pressure 1010.1 1009 | |
IN2019_E01 | 2019-07-30 04:24 [view ] | -9.5110 | 144.5042 | Nephelometer [view] | Maintenance | in2019_e01_Atmospherics | leak check performed instrument leak check, from software settings (exhaust plumbed to inlet). all passed. | |
IN2019_E01 | 2019-07-30 04:30 [view ] | -9.5265 | 144.5167 | Nephelometer [view] | Start | in2019_e01_Atmospherics | Zero check | |
IN2019_E01 | 2019-07-30 04:52 [view ] | -9.5828 | 144.5622 | EM710 [view] | SVP | GSM_in2019_e01 | New SVP in2019_e01_sst_08.asvp applied | |
IN2019_E01 | 2019-07-30 05:12 [view ] | -9.6367 | 144.6057 | Nephelometer [view] | Start | in2019_e01_Atmospherics | Span check | |
IN2019_E01 | 2019-07-30 05:19 [view ] | -9.6543 | 144.6200 | pCO2 [view] | Filter Clean | in2019_e01 | ||
IN2019_E01 | 2019-07-30 05:20 [view ] | -9.6552 | 144.6207 | Fluorometer [view] | Cleaned | in2019_e01 | ||
IN2019_E01 | 2019-07-30 05:20 [view ] | -9.6557 | 144.6210 | TSG [view] | Filter Clean | in2019_e01 | ||
IN2019_E01 | 2019-07-30 05:45 [view ] | -9.7085 | 144.6832 | EM122 [view] | Start | GSM_in2019_e01 | Start logging | |
IN2019_E01 | 2019-07-30 05:45 [view ] | -9.7090 | 144.6842 | EM710 [view] | GSM_in2019_e01 | SIS grid not working | ||
IN2019_E01 | 2019-07-30 05:54 [view ] | -9.7237 | 144.7098 | EM122 [view] | GSM_in2019_e01 | SIS offsets zeroed | ||
IN2019_E01 | 2019-07-30 05:55 [view ] | -9.7248 | 144.7118 | EM710 [view] | GSM_in2019_e01 | SIS offsets zeroed, start new survey D | ||
IN2019_E01 | 2019-07-30 05:59 [view ] | -9.7312 | 144.7228 | pCO2 [view] | Adjusted | in2019_e01 | Flow rate from STD4 is now correct. STD 1-3 decreased IAW email from John Akl | |
IN2019_E01 | 2019-07-30 06:11 [view ] | -9.7532 | 144.7517 | XBT [view] | Drop | GSM_in2019_e01 | XBT drop 2 prior to EM calibration site | |
IN2019_E01 | 2019-07-30 06:18 [view ] | -9.7598 | 144.7603 | Nephelometer [view] | Maintenance | in2019_e01_Atmospherics | Full calibration activated | |
IN2019_E01 | 2019-07-30 06:19 [view ] | -9.7600 | 144.7607 | XBT [view] | Drop | GSM_in2019_e01 | XBT drop 3 | |
IN2019_E01 | 2019-07-30 06:21 [view ] | -9.7608 | 144.7628 | MAAP [view] | Change | in2019_e01_Atmospherics | BC concentration unit after speaking to Ian McRobert, changed [BC] back to ug/m3 until all data processes downstream are verified and notified. | |
IN2019_E01 | 2019-07-30 06:36 [view ] | -9.7708 | 144.7733 | Other [view] | SVP | GSM_in2019_e01 | Rapid cast probe deployed from net drum | |
IN2019_E01 | 2019-07-30 06:37 [view ] | -9.7710 | 144.7737 | EM710 [view] | SVP | GSM_in2019_e01 | New SVP in2019_e01_xbt_003.asvp applied | |
IN2019_E01 | 2019-07-30 06:37 [view ] | -9.7710 | 144.7737 | EM122 [view] | SVP | GSM_in2019_e01 | New SVP in2019_e01_xbt_003.asvp applied | |
IN2019_E01 | 2019-07-30 06:46 [view ] | -9.7725 | 144.7743 | EM710 [view] | Other | GSM_in2019_e01 | Frequency range changed to 40-100kHz Initial issue changing- faulty ping status and owuld not transfer settings. Stopped and started pinging again, eventually came in. Issues tracking bottom in stbd sector | |
IN2019_E01 | 2019-07-30 06:48 [view ] | -9.7735 | 144.7748 | SBP [view] | Stop | GSM_in2019_e01 | Stop pinging for EM cal | |
IN2019_E01 | 2019-07-30 07:16 [view ] | -9.7688 | 144.7485 | EM710 [view] | Start | GSM_in2019_e01 | Roll line 1 Max angles 66/66 40-100kHz Dynamic | |
IN2019_E01 | 2019-07-30 07:17 [view ] | -9.7708 | 144.7485 | EM122 [view] | Start | GSM_in2019_e01 | Roll line 1 Max angles 66/66 | |
IN2019_E01 | 2019-07-30 07:20 [view ] | -9.7760 | 144.7485 | EM710 [view] | Start | GSM_in2019_e01 | Pitch line 1 Beam angles 40/40 | |
IN2019_E01 | 2019-07-30 07:20 [view ] | -9.7772 | 144.7485 | EM122 [view] | Start | GSM_in2019_e01 | Pitch line 1 Beam angles 40/40 | |
IN2019_E01 | 2019-07-30 07:34 [view ] | -9.7907 | 144.7482 | Nephelometer [view] | Maintenance | in2019_e01_Atmospherics | Span check post-adjust Span check | |
IN2019_E01 | 2019-07-30 07:41 [view ] | -9.7762 | 144.7485 | EM710 [view] | Start | GSM_in2019_e01 | Roll line 2 Max angles 66/66 | |
IN2019_E01 | 2019-07-30 07:41 [view ] | -9.7762 | 144.7485 | EM122 [view] | Start | GSM_in2019_e01 | Roll line 2 Max angles 66/66 | |
IN2019_E01 | 2019-07-30 07:54 [view ] | -9.7722 | 144.7545 | EM710 [view] | Start | GSM_in2019_e01 | Start yaw line 1 Angles 15/72 | |
IN2019_E01 | 2019-07-30 07:54 [view ] | -9.7722 | 144.7545 | EM710 [view] | Start | GSM_in2019_e01 | Start yaw line 1 Angles 15/68 | |
IN2019_E01 | 2019-07-30 08:11 [view ] | -9.7943 | 144.7415 | Nephelometer [view] | Maintenance | in2019_e01_Atmospherics | Zero check Post-adjust Zero Check | |
IN2019_E01 | 2019-07-30 08:22 [view ] | -9.7737 | 144.7423 | EM710 [view] | Start | GSM_in2019_e01 | Yaw line 2 Beam angles 15/72 | |
IN2019_E01 | 2019-07-30 08:22 [view ] | -9.7727 | 144.7423 | EM122 [view] | Start | GSM_in2019_e01 | Yaw line 2 Beam angles 15/68 | |
IN2019_E01 | 2019-07-30 08:32 [view ] | -9.7763 | 144.7483 | EM710 [view] | Start | GSM_in2019_e01 | Start latency line Beam angles 40/40 Spped 3 kts | |
IN2019_E01 | 2019-07-30 08:32 [view ] | -9.7763 | 144.7483 | EM122 [view] | Start | GSM_in2019_e01 | Start latency line Beam angles 40/40 Spped 3 kts | |
IN2019_E01 | 2019-07-30 08:44 [view ] | -9.7860 | 144.7487 | Nephelometer [view] | Observation | in2019_e01_Atmospherics | Zero check Zero cal/check does not appear to be working proplery. Cal ball valves did not close, cal control box did not work, zero air pump did not switch on. Will investigate tomorrow. | |
IN2019_E01 | 2019-07-30 09:24 [view ] | -9.8572 | 144.7975 | Nephelometer [view] | Maintenance | in2019_e01_Atmospherics | Zero Check test tested zero check functionality via remote terminal /udpterminal | |
IN2019_E01 | 2019-07-30 10:04 [view ] | -9.9720 | 144.8257 | XBT [view] | Drop | GSM_in2019_e01 | XBT drop 4 prior to deep water cal site | |
IN2019_E01 | 2019-07-30 10:09 [view ] | -9.9860 | 144.8242 | EM710 [view] | SVP | GSM_in2019_e01 | New SVP in2019_e01_xbt_004.asvp applied | |
IN2019_E01 | 2019-07-30 10:09 [view ] | -9.9860 | 144.8242 | EM122 [view] | SVP | GSM_in2019_e01 | New SVP in2019_e01_xbt_004.asvp applied | |
IN2019_E01 | 2019-07-30 10:33 [view ] | -9.9933 | 144.8513 | EM710 [view] | Start | GSM_in2019_e01 | Start deep cal roll 1 Beam angles 66/66 (reality getting 47/44) | |
IN2019_E01 | 2019-07-30 10:33 [view ] | -9.9933 | 144.8513 | EM122 [view] | Start | GSM_in2019_e01 | Start deep cal roll 1 Beam angles 66/66 | |
IN2019_E01 | 2019-07-30 10:38 [view ] | -9.9905 | 144.8418 | Underway | Steve Van Graas Hydrochem Lab : | Sample | TSG_Samples_in2019_e01 | |
IN2019_E01 | 2019-07-30 10:39 [view ] | -9.9898 | 144.8395 | EM710 [view] | Start | GSM_in2019_e01 | Pitch line 1 Beam angles 40/40 | |
IN2019_E01 | 2019-07-30 10:39 [view ] | -9.9898 | 144.8395 | EM122 [view] | Start | GSM_in2019_e01 | Pitch line 1 Beam angles 40/40 | |
IN2019_E01 | 2019-07-30 10:42 [view ] | -9.9880 | 144.8340 | Underway | steve vg Hydrochem Lab : | Sample | TSG_Samples_in2019_e01 | |
IN2019_E01 | 2019-07-30 10:44 [view ] | -9.9868 | 144.8307 | Underway | Stephanie Zeliadt Hydrochem Lab : | Sample | TSG_Samples_in2019_e01 | |
IN2019_E01 | 2019-07-30 11:02 [view ] | -9.9810 | 144.8135 | EM710 [view] | Start | GSM_in2019_e01 | Start pitch line 2 | |
IN2019_E01 | 2019-07-30 11:02 [view ] | -9.9810 | 144.8135 | EM122 [view] | Start | GSM_in2019_e01 | Start pitch line 2 | |
IN2019_E01 | 2019-07-30 11:31 [view ] | -9.9975 | 144.8350 | EM710 [view] | Start | GSM_in2019_e01 | Start yaw line 1 Max angles 15/72 | |
IN2019_E01 | 2019-07-30 11:31 [view ] | -9.9975 | 144.8350 | EM122 [view] | Start | GSM_in2019_e01 | Start yaw line 1 Max angles 15/72 Heading 288 | |
IN2019_E01 | 2019-07-30 11:53 [view ] | -9.9725 | 144.8162 | EM710 [view] | Start | GSM_in2019_e01 | Deep yaw line 2 | |
IN2019_E01 | 2019-07-30 11:53 [view ] | -9.9725 | 144.8162 | EM122 [view] | Start | GSM_in2019_e01 | Deep yaw line 2- offline Heading 108 | |
IN2019_E01 | 2019-07-30 12:12 [view ] | -9.9795 | 144.8367 | EM710 [view] | Start | GSM_in2019_e01 | Start deep yaw 3 heading 288 | |
IN2019_E01 | 2019-07-30 12:12 [view ] | -9.9795 | 144.8367 | EM122 [view] | Start | GSM_in2019_e01 | Start deep yaw 3 heading 288 Max angles 72/15 | |
IN2019_E01 | 2019-07-30 12:22 [view ] | -9.9730 | 144.8173 | EM710 [view] | GSM_in2019_e01 | End of patch test- all angles back to 72 | ||
IN2019_E01 | 2019-07-30 14:09 [view ] | -10.2810 | 144.9432 | EK60 [view] | Start | GSM_in2019_e01 | Start pinging/logging using ER60 software | |
IN2019_E01 | 2019-07-30 14:19 [view ] | -10.3127 | 144.9528 | SBP [view] | Start | GSM_in2019_e01 | Start pinging/logging | |
IN2019_E01 | 2019-07-30 14:28 [view ] | -10.3395 | 144.9612 | EM710 [view] | Stop | GSM_in2019_e01 | Stop logging | |
IN2019_E01 | 2019-07-30 16:05 [view ] | -10.6415 | 145.0545 | Underway | richard Hydrochem Lab : | Sample | TSG_Samples_in2019_e01 | |
IN2019_E01 | 2019-07-30 16:07 [view ] | -10.6503 | 145.0572 | Underway | Richard Hydrochem Lab : | Sample | TSG_Samples_in2019_e01 | |
IN2019_E01 | 2019-07-30 16:09 [view ] | -10.6548 | 145.0587 | Underway | steve vg Hydrochem Lab : | Sample | TSG_Samples_in2019_e01 | |
IN2019_E01 | 2019-07-30 16:15 [view ] | -10.6745 | 145.0647 | ADCP [view] | Start | in2019_e01 | Start Logging following patch test completion | |
IN2019_E01 | 2019-07-31 00:36 [view ] | -11.9413 | 145.4645 | MAAP [view] | Maintenance | in2019_e01_Atmospherics | Disconnected MAAP sample line for maintenance MAAP disconnected 12:20 hrs UTC | |
IN2019_E01 | 2019-07-31 00:38 [view ] | -11.9412 | 145.4645 | MAAP [view] | Maintenance | in2019_e01_Atmospherics | flow audit & 39;as is& 39; flow audit, gilibrator drawing lab air, T1 and Tref co-located Gilibrator = 16.52 (n=5), MAAP = 16.67; error = 0.6% T1 = 24.8, Tref -= 23.8 MAAP baroP = 1014, Ref BaroP = 1014 ---------------------------------------------------------------- Adjustments: T1 adjusted - 1 BaroP unchanged -------------------------------------------------------------- Final checks: Gilibrator = 16.62 (n=5), MAAP = 16.67 LPM; error 0.3% T1 = 23.3, Tref = 23.4 | |
IN2019_E01 | 2019-07-31 02:36 [view ] | -11.9412 | 145.4645 | MAAP [view] | Observation | in2019_e01_Atmospherics | MAAP Ozone interference test stopped MAAP disconnected from Ozone calibrator and reconnected to aerosol sample line 02:35hrs. No evidence of ozone interference found. | |
IN2019_E01 | 2019-07-31 02:38 [view ] | -11.9413 | 145.4643 | Aerosol Manifold [view] | Change | in2019_e01_Atmospherics | MAAP ball valve open Aerosol manifold possibly drawing in air from Aerosol Lab ~01:00 to 02:40hrs. MAAP had been disconnected from it& 39;s nafion dryer for testing, but MAAP inlet ball valve had not been closed. So possibly some back-flow into aerosol manifold during this time. | |
IN2019_E01 | 2019-07-31 03:24 [view ] | -11.9405 | 145.4648 | Nephelometer [view] | Maintenance | in2019_e01_Atmospherics | flow audit Neph disconnected from sample line 02:30 - 03:20hrs for flow calibration. Flows measured at inlet of Neph. Gilib (initial) = 5.121LPM (n=5). Alicat set = 5.000slpm Gilib (final) = 5.019LPM (n=5). Alicat set= 4.950slpm, read= 4.950slpm/14.76(v)lpm. | |
IN2019_E01 | 2019-07-31 04:37 [view ] | -11.9408 | 145.4645 | CTD [view] | 1 | in2019_e01 | CTD Frame Only Deployed for Ship Winch Test | |
IN2019_E01 | 2019-07-31 10:05 [view ] | -11.9570 | 145.4817 | ADCP [view] | in2019_e01 | OS150 and OS75 turned off for multibeam noise testing | ||
IN2019_E01 | 2019-07-31 10:07 [view ] | -11.9567 | 145.4817 | EM122 [view] | Start | GSM_in2019_e01 | Start noise test | |
IN2019_E01 | 2019-07-31 10:12 [view ] | -11.9552 | 145.4807 | Underway | Stephanie Zeliadt Hydrochem Lab : | Sample | TSG_Samples_in2019_e01 | |
IN2019_E01 | 2019-07-31 10:13 [view ] | -11.9548 | 145.4805 | Underway | steve vg Hydrochem Lab : | Sample | TSG_Samples_in2019_e01 | |
IN2019_E01 | 2019-07-31 10:16 [view ] | -11.9533 | 145.4805 | Underway | Stephanie Zeliadt Hydrochem Lab : | Sample | TSG_Samples_in2019_e01 | |
IN2019_E01 | 2019-07-31 11:19 [view ] | -12.0610 | 145.5002 | EM122 [view] | Stop | GSM_in2019_e01 | End noise tests | |
IN2019_E01 | 2019-07-31 11:19 [view ] | -12.0625 | 145.5005 | EM122 [view] | Start | GSM_in2019_e01 | Start pinging/logging New Patch values applied from this point forward | |
IN2019_E01 | 2019-07-31 14:07 [view ] | -12.5253 | 145.6390 | EM122 [view] | SVP | GSM_in2019_e01 | New SVP in2019_e01_sst_09.asvp applied | |
IN2019_E01 | 2019-07-31 22:19 [view ] | -13.8878 | 146.0653 | CTD [view] | 001 | Deployed | in2019_e01 | |
IN2019_E01 | 2019-07-31 22:32 [view ] | -13.8880 | 146.0650 | CTD [view] | Retrieved | in2019_e01 | ||
IN2019_E01 | 2019-07-31 23:49 [view ] | -13.8880 | 146.0650 | Radon Detector [view] | Start | in2019_e01_Atmospherics | Started following dry dock | |
IN2019_E01 | 2019-07-31 23:50 [view ] | -13.8880 | 146.0650 | Radon Detector [view] | Maintenance | in2019_e01_Atmospherics | Calibration started Calibration started. Flush for 6 hours then cal for 6 hours. Note we do not normally flush, as the dry air is constantly flushiing the source. The flush was added in this instance as an extra precaution | |
IN2019_E01 | 2019-08-01 00:26 [view ] | -13.8877 | 146.0652 | SMPS [view] | Outage | in2019_e01_Atmospherics | Switched instrument off to packup for repair Error 32 suggests that the peltier cooler is broken and GRIMM are asking to send it back to them in Germany. Ian is going to try to fix it in Hobart before sending it back, so I& 39;m packing everything up, including the PC. | |
IN2019_E01 | 2019-08-01 01:34 [view ] | -13.8872 | 146.0658 | CPC 3772 [view] | Maintenance | in2019_e01_Atmospherics | Flow cal Set the CPC back up and reconfigured the plumbing so that the orifice pressure on the CPC will register OK. Connected up to the strong vacuum so that the orifice pressure reads OK (this is fine because the MFC is maintaining the flow actual flow). When doing the flow cal with lab air: gilibrator 1.001 LPM set point 0.990 LPM (volumetric) When doing the flow cal inline: gilibrator 1.005 LPM set point 1.000 LPM The inline set point is really variable, but after an average of 10 tests, we& 39;ve decided to leave it as above. | |
IN2019_E01 | 2019-08-01 01:41 [view ] | -13.8872 | 146.0658 | CPC 3772 [view] | Start | in2019_e01_Atmospherics | CPC start, reconnected to main line | |
IN2019_E01 | 2019-08-01 03:16 [view ] | -13.8882 | 146.0643 | Both | Stop | in2019_e01_VSAT | Stopped for mast maintenance | |
IN2019_E01 | 2019-08-01 03:17 [view ] | -13.8882 | 146.0643 | Both | Start | in2019_e01_VSAT | Resumed normal operation post maintenance | |
IN2019_E01 | 2019-08-01 03:17 [view ] | -13.8882 | 146.0645 | Both | Auto Trim | in2019_e01_VSAT | Auto trim after vsat restart | |
IN2019_E01 | 2019-08-01 03:36 [view ] | -13.8878 | 146.0647 | Fluorometer [view] | Cleaned | in2019_e01 | ||
IN2019_E01 | 2019-08-01 04:31 [view ] | -13.8895 | 146.0642 | Other [view] | GSM_in2019_e01 | Drop keels flush with hull | ||
IN2019_E01 | 2019-08-01 04:31 [view ] | -13.8897 | 146.0642 | Other [view] | Start | GSM_in2019_e01 | POSMV GAMS calibration- starting figure 8s | |
IN2019_E01 | 2019-08-01 06:00 [view ] | -14.0207 | 146.0998 | Other [view] | GSM_in2019_e01 | End GAMS | ||
IN2019_E01 | 2019-08-01 06:46 [view ] | -14.1567 | 146.1433 | EM122 [view] | Start | GSM_in2019_e01 | ||
IN2019_E01 | 2019-08-01 09:19 [view ] | -14.6442 | 146.2222 | EK60 [view] | Start | GSM_in2019_e01 | Start pinging/logging to 1500m with EK80 software | |
IN2019_E01 | 2019-08-01 11:43 [view ] | -15.0993 | 146.2958 | Other [view] | in2019_e01 | restarted DC1 VM | ||
IN2019_E01 | 2019-08-01 14:16 [view ] | -15.6043 | 146.3285 | EM122 [view] | SVP | GSM_in2019_e01 | New SVP in2019_e01_sst_010.asvp applied | |
IN2019_E01 | 2019-08-01 18:28 [view ] | -16.4490 | 146.2613 | ADCP [view] | Start | in2019_e01 | ||
IN2019_E01 | 2019-08-01 20:18 [view ] | -16.7440 | 146.1480 | EM710 [view] | SVP | GSM_in2019_e01 | New SVP in2019_e01_sst_011.asvp applied | |
IN2019_E01 | 2019-08-01 21:37 [view ] | -16.8172 | 145.9818 | ADCP [view] | Stop | in2019_e01 | Stopped for reference surface work GSM | |
IN2019_E01 | 2019-08-01 21:39 [view ] | -16.8150 | 145.9800 | Other [view] | Stop | GSM_in2019_e01 | Stop all systems except em710 for reference surface | |
IN2019_E01 | 2019-08-01 22:23 [view ] | -16.7652 | 145.9403 | EM710 [view] | SVP | GSM_in2019_e01 | New SVP in2019_e01_svp_001.asvp applied | |
IN2019_E01 | 2019-08-01 22:29 [view ] | -16.7695 | 145.9445 | EM710 [view] | Start | GSM_in2019_e01 | AHO Reference Surface Line 1 | |
IN2019_E01 | 2019-08-01 22:43 [view ] | -16.8725 | 145.8078 | Underway Seawater Data | Stop | in2019_e01 | Underway Pumps Shut Down for End of E01 | |
IN2019_E01 | 2019-08-01 22:44 [view ] | -16.7805 | 145.9520 | EM710 [view] | Start | GSM_in2019_e01 | AHO Reference Surface Line 2 | |
IN2019_E01 | 2019-08-01 23:02 [view ] | -16.7743 | 145.9498 | EM710 [view] | Start | GSM_in2019_e01 | AHO Reference Surface XLine 1 Slightly crabbing at start | |
IN2019_E01 | 2019-08-01 23:21 [view ] | -16.7975 | 145.9238 | ADCP [view] | Start | in2019_e01 | ||
IN2019_E01 | 2019-08-02 00:08 [view ] | -16.8132 | 145.8402 | CCNC [view] | Maintenance | in2019_e01_Atmospherics | Empty drain, fill water supply, zero check. | |
IN2019_E01 | 2019-08-02 00:12 [view ] | -16.8240 | 145.8360 | CCNC [view] | Start | in2019_e01_Atmospherics | Resumed ambient sampling | |
IN2019_E01 | 2019-08-02 00:13 [view ] | -16.8267 | 145.8347 | CPC 3772 [view] | Maintenance | in2019_e01_Atmospherics | Emptied butanol catchpot, needed to unplug the vacuum to allow to drain. | |
IN2019_E01 | 2019-08-02 01:58 [view ] | -16.9257 | 145.7807 | Voyage | Stop | in2019_e01 | Stopped techsas and finalised voyage. |