Voyage: IN2019_E01       [details]
Subject: Annual maintenance
When: 2019-07-21 15:00:00 UTC

- entered into Elog/Everlog as 2019-07-21 15:00:00
Log: in2019_e01_Atmospherics
Equipment: SMPS

nano Scanning Mobility Particle Sizer (Grimm) [view]
Position: Position not recorded in Elog/Everlog.
Action: Maintenance
Encoding:HTML
SMPS maintenance including:
Comments:

SMPS maintenance including:

- Cleaning the external impactors with kimwipe and alcohol - the nozzle on the impactor (not the preimpactor) may have been installed backwards. See new procedure for proper installation.

- Cleaning the impactor at the top of the column with kimwipe and alcohol.

- Reapplicaiton of a thin layer of grease to all the impactors

- Cleaning of the DMA and all surfaces with kimwipes and alcohol. The DMA itself was very clean, and it was just the sections around the external screws that had a bit of corrosion on them. The brass connections looked reasonable, however one side (presumably the inlet) was dirty on the inside.

- Changed the excess air filter with a new one.