Voyage: IN2018_V08       [details]
When: 2019-01-02 18:44:18 UTC

- entered into Elog/Everlog as 2019-01-02 18:44:18
Log: FO_in2018_v08
Equipment: Rock Dredge

Rock Dredges [view]
Position: Latitude: -38.33167 Longitude: 155.4685

- entered into Elog as 38 19.9 S, 155 28.11 E
Action: At sea floor
Target Scope:3233
Peak load:6t
Station name:d11
Notes:hauling at 10m/m
Attachment:190102_191911_2019-01-02_19_18_38-Grafana_-_D11.png,190102_194959_2019-01-02_19_49_02-Grafana_-_Trawling_D11.png
6:51 call to take it upto 30 m/m.  ~7t tension.
7:46pm utc - bridge call to haul in at 10 m/m, then 15; 
Comments:

6:50 - master called to up hauling to 20 m/m - wire 3150 ; sog .9 ;

6:51 call to take it upto 30 m/m. ~7t tension.

7:06pm utc - ahuling in at 30 m/m (wire out @ 2686 ~ 6t ; Sog .3 - .5 (water=1kt)

7:23 pm utc - 4 minutes of load peak suggest a hook up - radio cat to wobble - as type it has now improved and winching in again.

7:38 utc - bridge call up to halt winding in and begin paying out @ 30m/m then 60, whilst the ship makes forawrd way - presumably to try capture a little more of the top of seamount. (2150 target) 4.5t

7:46pm utc - bridge call to haul in at 10 m/m, then 15;