Information: - Our applications will be disrupted from 2024-05-03 16:30 AEST to 2024-05-03 18:00 AEST Friday due to infrastructure upgrades. We apologize for any inconvenience and appreciate your patience during this maintenance window.
Please login if you have access to particular applications.
Event details
Voyage: | IN2018_V08 [details] |
When: | 2019-01-02 01:25:02 UTC - entered into Elog/Everlog as 2019-01-02 01:25:02 |
Log: | FO_in2018_v08 |
Equipment: | Rock Dredge
Rock Dredges [view] |
Position: |
Latitude: -37.636 Longitude: 156.29433
- entered into Elog as 37 38.16 S, 156 17.66 E |
Action: | At sea floor |
Wire Factor: | 4382 |
Station name: | D9 |
Notes: | START - dredge - slow haulin @ 20 m/m |
Attachment: | 190102_012639_2019-01-02_01_25_05-Grafana_-_Investigator_Summary.png,190102_013807_2019-01-02_01_37_29-seafloor.png,190102_023736_2019-01-02_02_36_51-Grafana_-_d9_hook_up.png |
1: | 57 am utc - continue backing up and paying out/ hauling in method. - wire @ 4098. |
2: | 40am UTc - Mike on the bridge - make the call the ship will take the reciprical approach. |
Comments: | 1:34am utc winch raised to 30m/m; sog .2; heading 303d; 1:39am utc - 11.7 spike and holding -attempt 1 to drop out 20 mtrs and try agin -no luck. 1:34am utc - 11.7t - attempt 2 - same again -no luck - call to continue winch tension and & 39;pull ship back to the dredge. slow going.\ 1:57 am utc - continue backing up and paying out/ hauling in method. - wire @ 4098. 2:09UTC - Attempt 3 - hmmm - .... 2:27am utc - radio chat about wire posion in relation to stern. - astern and hauling. 2:40am UTc - Mike on the bridge - make the call the ship will take the reciprical approach. |