Data Trawler - Event Details

Information: - Our applications will be disrupted from 2024-05-03 16:30 AEST to 2024-05-03 18:00 AEST Friday due to infrastructure upgrades. We apologize for any inconvenience and appreciate your patience during this maintenance window.
Please login if you have access to particular applications.
Username:
Password:

Event details

Voyage: IN2018_V08       [details]
When: 2019-01-02 01:25:02 UTC

- entered into Elog/Everlog as 2019-01-02 01:25:02
Log: FO_in2018_v08
Equipment: Rock Dredge

Rock Dredges [view]
Position: Latitude: -37.636 Longitude: 156.29433

- entered into Elog as 37 38.16 S, 156 17.66 E
Action: At sea floor
Wire Factor:4382
Station name:D9
Notes:START - dredge - slow haulin @ 20 m/m
Attachment:190102_012639_2019-01-02_01_25_05-Grafana_-_Investigator_Summary.png,190102_013807_2019-01-02_01_37_29-seafloor.png,190102_023736_2019-01-02_02_36_51-Grafana_-_d9_hook_up.png
1:57 am utc - continue backing up and paying out/ hauling in method. - wire @ 4098.
2:40am UTc - Mike on the bridge - make the call the ship will take the reciprical approach.
Comments:

1:34am utc winch raised to 30m/m; sog .2; heading 303d;

1:39am utc - 11.7 spike and holding -attempt 1 to drop out 20 mtrs and try agin -no luck.

1:34am utc - 11.7t - attempt 2 - same again -no luck - call to continue winch tension and & 39;pull ship back to the dredge. slow going.\

1:57 am utc - continue backing up and paying out/ hauling in method. - wire @ 4098.

2:09UTC - Attempt 3 - hmmm - ....

2:27am utc - radio chat about wire posion in relation to stern. - astern and hauling.

2:40am UTc - Mike on the bridge - make the call the ship will take the reciprical approach.

NCMI Information and Data Centre  »  Applications  »  Data Trawler