Please login if you have access to particular applications.
Event details
Voyage: | IN2018_V08 [details] |
When: | 2019-01-02 01:25:02 UTC - entered into Elog/Everlog as 2019-01-02 01:25:02 |
Log: | FO_in2018_v08 |
Equipment: | Rock Dredge
Rock Dredges [view] |
Position: |
Latitude: -37.636 Longitude: 156.29433
- entered into Elog as 37 38.16 S, 156 17.66 E |
Action: | At sea floor |
Wire Factor: | 4382 |
Station name: | D9 |
Notes: | START - dredge - slow haulin @ 20 m/m |
Attachment: | 190102_012639_2019-01-02_01_25_05-Grafana_-_Investigator_Summary.png,190102_013807_2019-01-02_01_37_29-seafloor.png,190102_023736_2019-01-02_02_36_51-Grafana_-_d9_hook_up.png |
1: | 57 am utc - continue backing up and paying out/ hauling in method. - wire @ 4098. |
2: | 40am UTc - Mike on the bridge - make the call the ship will take the reciprical approach. |
Comments: | 1:34am utc winch raised to 30m/m; sog .2; heading 303d; 1:39am utc - 11.7 spike and holding -attempt 1 to drop out 20 mtrs and try agin -no luck. 1:34am utc - 11.7t - attempt 2 - same again -no luck - call to continue winch tension and & 39;pull ship back to the dredge. slow going.\ 1:57 am utc - continue backing up and paying out/ hauling in method. - wire @ 4098. 2:09UTC - Attempt 3 - hmmm - .... 2:27am utc - radio chat about wire posion in relation to stern. - astern and hauling. 2:40am UTc - Mike on the bridge - make the call the ship will take the reciprical approach. |