Please login if you have access to particular applications.
Event details
Voyage: | IN2018_V08 [details] |
When: | 2018-12-31 21:57:20 UTC - entered into Elog/Everlog as 2018-12-31 21:57:20 |
Log: | FO_in2018_v08 |
Equipment: | Rock Dredge
Rock Dredges [view] |
Position: |
Latitude: -36.25433 Longitude: 158.8855
- entered into Elog as 36 15.26 S, 158 53.13 E |
Action: | At sea floor |
Wire Factor: | 4100 |
Peak load: | 10 |
Station name: | dredge6 |
Notes: | sog-.5, |
Attachment: | 181231_215941_2018-12-31_21_58_25-Grafana_-_Trawling_-_at_bottom.png,181231_215957_2018-12-31_21_58_50-em122-toch_down_-D6.png,181231_225648_2018-12-31_22_54_01-em122.png,181231_232303_2018-12-31_23_21_50-Grafana_-_Trawling_-_1hr_representaion_of_hook_up.png |
Bit of a hang up @21: | 58utc |
10: | 33 utc persistent @11.3 t (wire @3564 - Depth 3355) |
10: | 1) - SHIP HAS MANOUVERED TO THE EAST - ATTEMPT AGAIN AND STILL HOOKED. shIP NOW COMING BACK THE WAY IT CAME |
Comments: | Bit of a hang up @21:58utc paying further out @15m/m 1005pm utc\additoanl more payed out 260m/m - persistent tension @11t. Considered as & 39;hung up& 39; currently. 10:10 -free 10:33 utc persistent @11.3 t (wire @3564 - Depth 3355) 10:38:continue hangup @ 11.2 t10:50 utc continue hangup. Ship has haulded in wire - 3430 depth 3392 (ALMOST 1:1) - SHIP HAS MANOUVERED TO THE EAST - ATTEMPT AGAIN AND STILL HOOKED. shIP NOW COMING BACK THE WAY IT CAME 1113 cathouse informs bridge ' wire is free'hauling in @ 80 m/m |