Please login if you have access to particular applications.
Event details
| Voyage: | IN2018_V08 [details] |
| When: | 2018-12-29 03:21:25 UTC - entered into Elog/Everlog as 2018-12-29 03:21:25 |
| Log: | FO_in2018_v08 |
| Equipment: | Rock Dredge
Rock Dredges [view] |
| Position: |
Latitude: -40.121 Longitude: 157.0995
- entered into Elog as 40 07.26 S, 157 05.97 E |
| Action: | Retrieve |
| Peak load: | 3t |
| Total Scope: | 1280 (plus 200) |
| Station name: | site 44- dredge 2 |
| Notes: | lift off sea floor |
| Attachment: | 181229_032450_Capture_S4_D2_lift_off.PNG |
| Comments: | Recovery of dreadge happened well. good catch - a Big rock caaught and was & 39;coherent& 39; meaning was pulled off fixed structure - not collected loose structure. |