Data Trawler - Event Details

Information: - Our applications will be disrupted from 2024-05-03 16:30 AEST to 2024-05-03 18:00 AEST Friday due to infrastructure upgrades. We apologize for any inconvenience and appreciate your patience during this maintenance window.
Please login if you have access to particular applications.
Username:
Password:

Event details

Voyage: IN2019_V04       [details]
Subject: Magnetometer
When: 2019-08-07 11:24:16 UTC

- entered into Elog/Everlog as 2019-08-07 11:24:16
Log: GSM_in2019_v04
Equipment: Mag

Marine Magnetics SeaSPY2 Overhauser Magnetometer [view]
Position: Latitude: -17.73083 Longitude: 147.873

- entered into Elog as 17 43.85 S, 147 52.38 E
Action: Other
Comments:

With the assistance of SIT/DAP the Magnetometer laptop was reconfigured using FRanson GpsGate to handle the bi-directional comms for the SeaSPY2 better after experiencing a lockup and not being able to sync with GPS time. System now used TCP to the Comtrol rather than UDP. "BOB" was reinstalled as a fresh install *ver 3.2.0.61".

NCMI Information and Data Centre  »  Applications  »  Data Trawler