Please login if you have access to particular applications.
Event details
| Voyage: | IN2020_E01 [details] |
| Subject: | Patch test values added to EM122 SIS |
| When: | 2020-08-01 18:52:12 UTC - entered into Elog/Everlog as 2020-08-01 18:52:12 |
| Log: | GSM_in2020_e01 |
| Equipment: | EM122
Kongsberg EM122 12kHz multibeam echo sounder [view] |
| Station/Location: | Storm Bay |
| Position: |
Latitude: -43.37533 Longitude: 148.33533
- entered into Elog as 43 22.52 S, 148 20.12 E |
| Action: | Other |
| Patch tests results unchanged from before: | |
| Attitude 1: | Roll = 0.07, Pitch = -0.09, Heading = -0.08 |
| Attitude 2: | Roll = -0.035, Pitch = -0.215, Heading = 0.005 |
| Line: | 0041 |
| Seastate: | 5 |
| Depth: | 128 Wire out: 140m |
| Comments: | Patch tests results unchanged from before: Attitude 1: Roll = 0.07, Pitch = -0.09, Heading = -0.08 Attitude 2: Roll = -0.035, Pitch = -0.215, Heading = 0.005 |