Data Trawler - Survey Details

Please login if you have access to particular applications.
Username:
Password:

Voyage details and related metadata, reports, events and data.

IN2017_E02    - is a Marine National Facility voyage

Title: MNF equipment sea trials

Voyage details on MNF site: https://mnf.csiro.au/en/Voyages/IN2017_E02

Period: 2017-03-31 05:20 to 2017-04-02 08:00 UTC

Duration: 2.11 days

From: Hobart To: Hobart

Region: South Tasmanian coast

Ship: Investigator (RV) [details]

Description: Gear Trials

Leader: Don McKenzie (MNF)

Project: Investigator - general vessel operations, gear trials, etc. [details] Primary


Voyage extents: 44° 12.7' S to 42° 53.2' S    147° 20.3' E to 147° 39.3' E Get voyage track shapefile Get CSV


Marlin Metadata:-

  • RV Investigator Radon Data - Selected Voyages (2014 onwards) [details]

  • RV Investigator Underway UWY Data (Unprocessed) [details]

  • RV Investigator Voyage IN2017_E02 EK60 Echosounder [details]

  • RV Investigator Voyage IN2017_E02 EM122 Multibeam Echosounder Data [details]

  • RV Investigator Voyage IN2017_E02 EM710 MKII Multibeam Echosounder Data [details]

  • RV Investigator Voyage IN2017_E02 End of Voyage (EOV) Archive [details]

  • RV Investigator Voyage IN2017_E02 Gravity Data [details]

  • RV Investigator Voyage IN2017_E02 Underway UWY Data (Unprocessed) [details]

  • Cruise Summary Report at SeaDataNet:-

  • View Cruise Summary Report at https://csr.seadatanet.org
  • Participants - on ship:-

    NameRoleOrganisation Project
    Don McKenzie Voyage Manager Marine National Facility Voyage Management on RV Investigator
    Matt Kimber Deputy Voyage Manager Marine National Facility Voyage Management on RV Investigator

    This list includes those that may have only been on part of the voyage. See voyage reports on 'Reports and Maps' tab for details.

    Marine National Facility Reports - plans, summaries and data processing

    Publications, reports and datasets from this voyage.

    Dataset

    • McKenzie, Don (ex-CSIRO); Watts, Dave; Navidad, Cisco; Boyd, Matt; Fox, Ruby (2024): IN2017_E02 Southeast Tasmania Bathymetry 10m - 210m Multi-resolution AusSeabed products. v1. CSIRO. Data Collection.     10.25919/zgqj-ej28

    Search for publications, reports and datasets from this and other voyages

    Data publishing

    This is a list of online datasets hosted by CSIRO. Other processed datasets hosted by collaborating organisations may be found on the 'Metadata' or "Reports, Publications and Maps' tab.
    Use the Get data link on the right to extract data using the NCMI Data Trawler.

    Data StreamData SummaryGet data
    Gravity Measurements
    Time (UTC): 2017-03-31 03:03 to 2017-04-02 07:04
    Latitude: -44.20 to -42.89
    Longitude: 147.34 to 147.65
    Get Data from Trawler

    Geophysical Survey and Mapping acquisition report

    Multibeam echosounder
    Time (UTC): 2017-03-31 04:03 to 2017-04-02 07:04
    Latitude: -44.21 to -42.89
    Longitude: 147.34 to 147.65
    Datafiles: 89
    Total size: 6.31 Gb
    Get Data from Trawler

    Geophysical Survey and Mapping acquisition report

    Radon measurements
    Time (UTC): 2017-03-31 00:00 to 2017-04-02 23:00
    Latitude: -44.20 to -42.88
    Longitude: 147.34 to 147.65
    Measurements:72
    Get Data from Trawler

    Download RV Investigator Radon dataset (XLSX)

    Singlebeam echosounder
    Time (UTC): 2017-03-31 06:07 to 2017-04-02 06:05
    Latitude: -44.18 to -43.16
    Longitude: 147.42 to 147.65
    Datafiles: 47
    Total size: 4.57 Gb
    Get Data from Trawler

    Geophysical Survey and Mapping acquisition report

    Caveat: this event log was authored on the voyage using either a standalone logging system called ELOG or more recently an inhouse event logging tool called Everlog. For this reason, some positions are unknown and may be resolved using the logged time and the underway dataset for the voyage.

    Search for events from this voyage and others

    Events ordered by start time:- Click on column header to sort. Use link on 'When' to see full details. Use the CSV button at the bottom to export data.

    When (UTC) LatitudeLongitude InstrumentIdentifierActionLogSubject / Comments
    2017-03-31 03:05 [view ] -42.8864 147.3388 Gravity Meter [view] Start GSM_in2017_e02
    2017-03-31 04:23 [view ] -42.8862 147.3391 Other [view] in2017_e02 Departure from PW4
    2017-03-31 04:32 [view ] -42.8872 147.3443 EM710 [view] Start GSM_in2017_e02
    2017-03-31 06:00 [view ] -43.0960 147.4195 Other [view] Start GSM_in2017_e02 SVP probe started
    2017-03-31 06:04 [view ] -43.0850 147.4103 ADCP [view] Start in2017_e02
    2017-03-31 06:07 [view ] -43.0952 147.4188 EK60 [view] Start GSM_in2017_e02
    2017-03-31 07:36 [view ] -43.2352 147.5378 Brenke sled [view] Deployed in2017_e02
    2017-03-31 07:45 [view ] -43.2360 147.5387 Brenke sled [view] on bottom in2017_e02
    2017-03-31 07:51 [view ] -43.2385 147.5393 Brenke [view] 1 on bottom in2017_e02_Science
    2017-03-31 08:11 [view ] -43.2413 147.5412 Brenke sled [view] off bottom in2017_e02
    2017-03-31 08:25 [view ] -43.2413 147.5422 Brenke sled [view] on deck in2017_e02
    2017-03-31 09:49 [view ] -43.2417 147.5418 Other [view] Other in2017_e02 moving from brenke sled site after trawl doors configured
    2017-03-31 10:16 [view ] -43.2938 147.5498 EM710 [view] Stop GSM_in2017_e02 seems noisy so a restart
    2017-03-31 10:35 [view ] -43.3213 147.5510 Gravity Meter [view] Stop GSM_in2017_e02 shut for night
    2017-03-31 11:09 [view ] -43.3690 147.5530 EM122 [view] Start GSM_in2017_e02 em7109 continues to fail to start so switching to em122 and put in medium mode for the night even though it is still less than 500m
    2017-03-31 20:01 [view ] -44.0238 147.6372 EK60 [view] Start GSM_in2017_e02 dodgy ethernet cables wriggled - it can now ping
    2017-03-31 20:06 [view ] -44.0315 147.6380 EK60 [view] Line GSM_in2017_e02 sat logiing to see the noise - bist was not good with noise reportred
    2017-03-31 23:45 [view ] -44.0628 147.6463 EM710 [view] Other GSM_in2017_e02 just shutdown ek60 to see if any intetefnce as em710 is really nisy - check this line for DQ
    2017-03-31 23:46 [view ] -44.0630 147.6463 EK60 [view] Stop GSM_in2017_e02 see em710
    2017-04-01 03:20 [view ] -44.0774 147.6071 TSG [view] Start in2017_e02 Calibration run
    2017-04-01 04:54 [view ] -44.1080 147.5428 Other [view] restarted in2017_e02 CCT server restarted after bridge and cat house lost connection. Reboot of clients did not resolve the issue
    2017-04-01 05:25 [view ] -44.1240 147.5177 TSG [view] Stop in2017_e02 calibration run 1
    2017-04-01 06:00 [view ] -44.1320 147.5108 EM710 [view] Other GSM_in2017_e02 turned on ek60 to see if em710 goes bad
    2017-04-01 06:44 [view ] -44.1362 147.5118 VSAT Soft Start in2017_e02 retarget vsat terminals
    2017-04-01 09:18 [view ] -44.1618 147.5348 EM710 [view] Other GSM_in2017_e02 tuned off ek60 to see noise level
    2017-04-01 10:09 [view ] -44.1670 147.5395 EM710 [view] SVP GSM_in2017_e02 tuned off ek60 to see noise level
    2017-04-01 21:33 [view ] -44.0977 147.5943 EM122 [view] SVP GSM_in2017_e02 sst01
    2017-04-01 21:33 [view ] -44.0978 147.5942 EM710 [view] SVP GSM_in2017_e02 sst01
    2017-04-02 00:15 [view ] -44.2092 147.4693 VSAT Soft Start in2017_e02 re-targeted port and starboard vsat antennas
    2017-04-02 00:40 [view ] -44.2113 147.4522 EM710 [view] Other GSM_in2017_e02 back to xte trigger for ek60 etc. to see if noise is limited
    2017-04-02 01:07 [view ] -44.1370 147.4667 EM122 [view] SVP GSM_in2017_e02 sst02
    2017-04-02 01:07 [view ] -44.1363 147.4670 EM710 [view] SVP GSM_in2017_e02 sst02
    2017-04-02 04:12 [view ] -43.5400 147.5268 EM122 [view] Stop GSM_in2017_e02 final loging - using em710
    2017-04-02 06:06 [view ] -43.1558 147.4608 EK60 [view] Stop GSM_in2017_e02 in derwent
    2017-04-02 06:19 [view ] -43.1187 147.4300 ADCP [view] Stop in2017_e02
    2017-04-02 07:27 [view ] -42.9367 147.3785 EM710 [view] Stop GSM_in2017_e02 end of voyage
    2017-04-02 07:27 [view ] -42.9358 147.3785 Gravity Meter [view] Stop GSM_in2017_e02 end of voyage
    2017-04-02 07:36 [view ] Techsas1 [view] Stop in2017_e02 stopped techsas 1 and 2 + underway merger

    Save this list as

    Deployments - None have been recorded in the Data Trawler.

    NCMI Information and Data Centre  »  Applications  »  Data Trawler