Data Trawler - Survey Details

O&A Information and Data Centre  »  Applications  »  Data Trawler
Please login if you have access to particular applications.
Username: Password:

Voyage details and related metadata, reports, events and data.

IN2016_T02     - is a Marine National Facility voyage

Period:- 2016-08-25 to 2016-08-29

From: Hobart To: Sydney

Region: Hobart, Sydney, Australia East Coast

Ship :- Investigator (RV) [details]

Project:- National Facility External Users: A. Bowie (ACE CRC) Australasian GEOTRACES [details]

Description:- Voyage objectives The main objective of this transit voyage is to move the vessel from Hobart to Sydney prior to IN2016_V04. The objectives listed below are complementary with the transit. 1. Natural iron fertilisation of the oceans around Australia: linking terrestrial dust and bushfires to marine biogeochemistry Oceans play a vital role in Earth’s climate through the control of atmospheric CO2. An important component of this system is the iron cycle, in which iron-rich aerosols are transported from land via atmosphere to ocean. Iron is a key micronutrient for marine phytoplankton, the scarcity of which controls essential biogeochemical processes. This project will facilitate an integrated ship-based atmospheric observational program for trace elements in oceans around Australia. During the voyages, we will sample and conduct experiments on atmospheric particles containing terrestrial dust, bushfire smoke and anthropogenic emissions that are transported from Australia to its surrounding oceans. This will provide the critical information on atmospheric iron supply for ocean fertility and health, providing the science for predicting a key factor in the future impact of the oceans on climate. The project supports the training and research of two postgraduate PhD students from IMAS-UTAS. 2. We will also opportunistically collect event-based clean rainwater samples using either a polyethylene funnel and collection bottle (when conditions allow) or a Dual Chimney Precipitation Sampler (N-Con Systems model 00-127; currently on order), to quantify the trace metal deposition in the ‘bulk’ and ‘precipitate-only’ fractions. Ideally samples would be collected on upper and forward decks, either above the bridge or at the bow when heading into the wind.




Metadata:-

  • CSIRO O&A RV Investigator ISAR/SST Sea Surface Temperature Data Overview (2014 - present) [details]

  • RV Investigator Radon Data - Selected Voyages (2015 onwards) [details]

  • RV Investigator Sea Carbon Dioxide (CO2) Data - Selected Voyages (2014 onwards) [details]

  • RV Investigator Voyage IN2016_T02 EK60 Echosounder [details]

  • RV Investigator Voyage IN2016_T02 EM122 Multibeam Echosounder Data [details]

  • RV Investigator Voyage IN2016_T02 EM710 MKII Multibeam Echosounder Data [details]

  • RV Investigator Voyage IN2016_T02 End of Voyage (EOV) Archive [details]

  • RV Investigator Voyage IN2016_T02 Gravity Data [details]

  • RV Investigator Voyage IN2016_T02 Seabird Observations [details]

  • RV Investigator Voyage IN2016_T02 Underway UWY Data (Unprocessed) [details]

  • RV Investigator Voyage IN2016_T02 XBT Data [details]

  • Participants:- Click on column header to sort

    NameRoleOrganisation
    Ben ArthurEducation & OutreachCSIRO Services
    Andy BowieChief ScientistUTAS
    Matt BoydGeophysical Surveying and Mapping SupportMNF
    Nicholas CarlileBird SurveyNSW-OEH
    Francis ChuiData Acquisition and Processing Computing SupportMNF
    Owen CraigCommunicationsCSIRO Comms.
    Warrick GlynnCommunicationsIMOS
    Kim Arne GrønengVendorRapp Hydema
    Ann JonesReporterABC
    Matt KimberObserverMNF
    Chris Krishna-PillayEducation & OutreachCSIRO Services
    Leonardo LaioloPhD studentUTS
    Matt MarrisonCommunicationsCSIRO Comms.
    Amy NauGeophysical Surveying and Mapping SupportMNF
    Martin OstrowskiPrincipal InvestigatorMQ
    Rod PalmerSeagoing Instrumentation Team SupportMNF
    Bard Morten PedersonVendorRapp Hydema
    Morgane PerronAerosolsIMAS
    Ron PlaschkeObserverMNF
    Ben RaeObserverCSIRO NCMI
    Mick RoderickBird SurveyNSW-OEH
    Peter ShanksData Acquisition and Processing Computing SupportCSIRO O&A
    Tegan SimeVoyage ManagerMNF
    Michal StrzelecAerosolsIMAS
    Stephen ThomasSeagoing Instrumentation Team SupportMNF
    Steve Van GraasData Acquisition and Processing Computing SupportMNF
    Marian WiltshireCommunicationsIMOS

    This list includes those that may have only been on part of the voyage. See voyage reports on 'Reports and Maps' tab for details.

    Reports

    Data publishing:- This is a list of online datasets. use the Get data link on the right to extract data using the O&A Data Trawler.

    Data StreamData SummaryGet data
    Species sightings
    From: 2016-08-25 01:17 to 2016-08-29 08:53 UTC
    Latitude: -43.29 to -33.84
    Longitude: 147.34 to 151.74
    Observations: 393
    Get Data from Trawler

    Multibeam echosounder
    From: 2016-08-25 02:14 to 2016-08-28 20:49 UTC
    Latitude: -43.24 to -33.92
    Longitude: 147.38 to 151.73
    Datafiles: 166
    Total size: 13.95 Gb
    Get Data from Trawler

    Caveat: this event log was authored on the voyage using a standalone logging system called ELOG which has no linkages to any underway or GPS data feeds. For this reason, some positions are unknown and may be resolved using the logged time and the underway dataset for the voyage.

    Events by start time:- Click on column header to sort. Use event date link to see full details. Use the CSV button at the bottom to export data.

    When (UTC) LatitudeLongitide InstrumentIdentifierActionSubject / Comments
    2016-08-24 23:30 -42.8863 147.3387 Gravity Meter
    [view]
    Start Gravity meter turned on
    2016-08-24 23:45 TSG
    [view]
    Start
    2016-08-24 23:45 pCO2
    Start
    2016-08-25 00:21 -42.8863 147.3387 Other
    Both EMs Waterline values in SIS changed to 0.339 Previous value 0.85
    2016-08-25 00:21 -42.8863 147.3387 Other
    Draft Draft Measurments Prior to Departure F6.45 A5.9
    2016-08-25 01:35 -42.9163 147.3830 ADCP
    [view]
    Start both os75 and os150 started
    2016-08-25 01:45 drop keel
    [view]
    Deployed Both port and stdb keels lowered and locked at 2m
    2016-08-25 01:50 -42.9460 147.3768 Other
    Other Keels locked at 2m
    2016-08-25 02:50 -43.1108 147.4647 EM710
    [view]
    SVP New SVP applied in2016_t02_ssst001.asvp sst= 10.5
    2016-08-25 03:36 -43.2093 147.6112 EM710
    [view]
    SVP New SVP applied in2016_t02_ssst002.asvp
    2016-08-25 04:42 -43.2915 147.8807 EM710
    [view]
    SVP New SVP applied in2016_t02_ssst003.asvp
    2016-08-25 06:48 ADCP
    [view]
    Change both os75 and os150 changed from bottom tracking
    2016-08-25 16:55 -41.2088 148.9013 EM710
    [view]
    Start Start Logging
    2016-08-25 16:55 -41.2088 148.9013 EM122
    [view]
    SVP New SVP applied in2016_t02_ssst004.asvp
    2016-08-25 16:55 -41.2088 148.9013 EM710
    [view]
    SVP New SVP applied in2016_t02_ssst004.asvp
    2016-08-25 17:06 -41.1777 148.9077 EM122
    [view]
    SVP New SVP applied in2016_t02_sst005.asvp
    2016-08-25 17:06 -41.1777 148.9077 EM710
    [view]
    SVP New SVP applied in2016_t02_sst005.asvp
    2016-08-25 18:17 -40.9353 148.8373 EM710
    [view]
    Start Start Logging
    2016-08-25 18:53 -40.8138 148.8022 EM710
    [view]
    SVP New SVP applied in2016_e01_sst006
    2016-08-25 18:53 -40.8138 148.8022 EM122
    [view]
    SVP New SVP applied in2016_e01_sst006
    2016-08-25 19:25 -40.7020 148.7697 EM710
    [view]
    SVP New SVP applied in2016_e01_sst007
    2016-08-25 19:25 -40.7020 148.7697 EM122
    [view]
    SVP New SVP applied in2016_e01_sst007
    2016-08-25 19:40 -40.6517 148.7553 EM122
    [view]
    Stop Stop Logging
    2016-08-25 20:14 -40.5402 148.7230 EM710
    [view]
    Start Dual swath mode turned on for resolution test
    2016-08-25 20:14 -40.5402 148.7230 EK60
    [view]
    Start EK60 turned off to remove interferance in EM710
    2016-08-25 20:40 -40.4565 148.6990 EK60
    [view]
    Start Logging with 70kHz in Passive to prevent interference with em710
    2016-08-25 21:06 ADCP
    [view]
    Change 75 eventually changed to bottom track after figuring out the baud rate (38400)
    2016-08-25 21:33 ADCP
    [view]
    Change 150kHz changed to bottom tracking
    2016-08-25 22:16 ADCP
    [view]
    Stop turned off for site survey
    2016-08-25 22:34 EM710
    [view]
    Start Entering Hydrographic site
    2016-08-25 22:39 Instrument Clean Seawater pump
    [view]
    Stop All underway science seawater pumps off for Engineers to conduct tests
    2016-08-25 22:55 Instrument Clean Seawater pump
    [view]
    Start Engineers completed tests on science seawater pump systems
    2016-08-25 22:57 EM710
    [view]
    Start Start Logging 1st Line in hazard site
    2016-08-25 23:04 EM710
    [view]
    Start Start Logging 2nd Line in hazard site
    2016-08-25 23:12 EM710
    [view]
    Start Start Logging 3rd Line in hazard site
    2016-08-25 23:19 EM710
    [view]
    Start Start Logging 4th Line in hazard site
    2016-08-25 23:28 EM710
    [view]
    Start Start Logging 5th Line in hazard site
    2016-08-25 23:36 EM710
    [view]
    Start Start Logging 6th Line in hazard site
    2016-08-25 23:46 EM710
    [view]
    Start Start Logging 7th Line in hazard site
    2016-08-25 23:55 EM710
    [view]
    Start Start Logging Transit from hazard site
    2016-08-26 00:14 EM710
    [view]
    Start Start Logging Line 1 Full Site
    2016-08-26 00:50 EM710
    [view]
    Start Start Logging Line 2 Full Site
    2016-08-26 01:25 EM710
    [view]
    Start Start Logging Line 3 Full Site
    2016-08-26 01:55 EM710
    [view]
    Start Start Logging Line 4 Full Site
    2016-08-26 02:27 EM710
    [view]
    Start Start Logging Line 5 Full Site
    2016-08-26 02:57 EM710
    [view]
    Start Start Logging Line 6 Full Site
    2016-08-26 03:26 EM710
    [view]
    Start Start Logging Line 7 Full Site
    2016-08-26 03:56 EM710
    [view]
    Start Start Logging Line 8 Full Site
    2016-08-26 03:56 EM710
    [view]
    Start Start Logging Line 9 Full Site
    2016-08-26 04:52 EM710
    [view]
    Start Start Logging Line 10 Full Site
    2016-08-26 05:23 EM710
    [view]
    Start Start Logging Line 11 Full Site
    2016-08-26 05:51 EM710
    [view]
    Start Start Logging Line 12 Full Site
    2016-08-26 05:52 -40.0425 148.5747 EM710
    [view]
    SVP New SVP applied in2016_t02_xbt002
    2016-08-26 05:52 -40.0465 148.5927 EM710
    [view]
    SVP New SVP applied in2016_t02_sst009
    2016-08-26 05:52 -40.0297 148.5277 EM710
    [view]
    SVP SVP applied in2016_t02_sst009
    2016-08-26 06:21 EM710
    [view]
    Start Start Logging Line 13 Full Site
    2016-08-26 06:49 EM710
    [view]
    Start Start Logging Line 14 Full Site
    2016-08-26 07:20 EM710
    [view]
    Start Start Logging Line 15 Full Site
    2016-08-26 07:47 EM710
    [view]
    Start Start Logging Line 16 Full Site
    2016-08-26 08:16 EM710
    [view]
    Start Start Logging Line 17 Full Site
    2016-08-26 08:43 EM710
    [view]
    Start Start Logging Line 18 Full Site
    2016-08-26 09:11 EM710
    [view]
    Start Start Logging Line 19 Full Site
    2016-08-26 09:38 EM710
    [view]
    Start Start Logging Line 20 Full Site
    2016-08-26 10:06 EM710
    [view]
    Start Start Logging Line 21 Full Site
    2016-08-26 10:35 EM710
    [view]
    Start Start Logging Line 22 Full Site
    2016-08-26 11:04 EM710
    [view]
    Start Start Logging Line 23 Full Site
    2016-08-26 11:33 EM710
    [view]
    Start Start Logging Line 24 Full Site
    2016-08-26 12:04 EM710
    [view]
    Start Start Logging Line 25 Full Site
    2016-08-26 12:31 EM710
    [view]
    Start Start Logging Line 26 Full Site
    2016-08-26 13:00 EM710
    [view]
    Start Start Logging Line 27 Full Site
    2016-08-26 13:30 EM710
    [view]
    Start Start Logging Line 28 Full Site
    2016-08-26 14:00 EM710
    [view]
    Start Start Logging Line 29 Full Site
    2016-08-26 14:29 EM710
    [view]
    Start Start Logging Line 30 Full Site
    2016-08-26 14:48 EM710
    [view]
    Start Start Logging Line 31 Full Site
    2016-08-26 15:27 EM710
    [view]
    Start Start Logging Line 32 Full Site
    2016-08-26 15:55 EM710
    [view]
    Start Start Logging Line 33 Full Site
    2016-08-26 16:24 EM710
    [view]
    Start Start Logging Line 34 Full Site
    2016-08-26 16:53 EM710
    [view]
    Start Start Logging Line 35 Full Site
    2016-08-26 17:20 EM710
    [view]
    Start Start Logging Line 36 Full Site
    2016-08-26 17:49 EM710
    [view]
    Start Start Logging Line 37 Full Site
    2016-08-26 18:18 EM710
    [view]
    Start Start Logging Line 38 Full Site
    2016-08-26 18:49 EM710
    [view]
    Start Start Logging Line Gap fill transit to next site
    2016-08-26 19:06 EM710
    [view]
    Start Start Logging Line Gap fill transit to next site
    2016-08-26 19:33 EM710
    [view]
    Start Start Logging Line Gap fill transit to next site
    2016-08-26 20:07 EM710
    [view]
    Start Start Logging Line 1 Site B
    2016-08-26 20:33 EM710
    [view]
    Start Start Logging Line 2 Site B
    2016-08-26 21:00 EM710
    [view]
    Start Start Logging Line 3 Site B
    2016-08-26 21:29 EM710
    [view]
    Start Start Logging Line 4 Site B
    2016-08-26 21:57 EM710
    [view]
    Start Start Logging Line 5 Site B
    2016-08-26 22:50 EM710
    [view]
    Stop Stop Logging hydro survey data
    2016-08-27 00:08 -39.9976 148.6064 CTD
    [view]
    1 Retrieved
    2016-08-27 00:10 -39.9982 148.6057 Acoustics
    [view]
    Start 75kzh ACDP started
    2016-08-27 00:11 -39.9998 148.6037 Other
    SVP CTD Cast conducted for check of sound velocity
    2016-08-27 00:41 -39.9512 148.6862 EM710
    [view]
    SVP New SVP applied in2016_e01_ctd001
    2016-08-27 00:41 -39.9512 148.6862 EM122
    [view]
    SVP New SVP applied in2016_e01_ctd001
    2016-08-27 01:48 -39.8370 148.9237 EM710
    [view]
    Stop Stop Logging
    2016-08-27 02:33 ADCP
    [view]
    Change changed from bottom tracking to no bottom tracking for os75 and os150
    2016-08-27 02:35 -39.7542 149.0887 EM122
    [view]
    SVP New SVP applied in2016_t02_sst009
    2016-08-27 03:19 Weather Radar
    [view]
    Stop Radar shutdown after observing open cabinet door on side of antenna.
    2016-08-27 06:34 -39.2487 149.7767 EM122
    [view]
    SVP New SVP applied in2016_t02_sst010
    2016-08-27 09:02 -38.8223 149.9185 EM122
    [view]
    SVP New SVP applied in2016_t02_sst012
    2016-08-27 09:02 -38.8223 149.9185 EM122
    [view]
    SVP SIS restarted- SV Used was not updating based on sensor
    2016-08-27 11:54 -38.2922 150.1528 EM122
    [view]
    SVP New SVP applied in2016_t02_sst013
    2016-08-27 18:38 -37.0260 150.4942 EM122
    [view]
    SVP New SVP applied in2016_t02_sst015
    2016-08-27 18:38 -37.0260 150.4942 Other
    Draft Draft Measurments Mid Voyage F6.35 A5.8
    2016-08-27 20:01 -36.8013 150.6192 EM122
    [view]
    SVP New SVP applied in2016_t02_sst016
    2016-08-27 23:42 CTD
    [view]
    2 Deployed CTD cast 2 for Rapp Hydema winch tests CTD cast start: 22:28 CTD cast end: 23:31 Max pressure 323dbar
    2016-08-27 23:43 Coring
    Deployed Deployment of test weight to test winch for Rapp Hydema Corer test weight deployed 23:43 (27 Aug) to 1000m only Corer test weight back onboard 00:28 (28 AUG)
    2016-08-28 11:55 -34.8862 151.5043 EM122
    [view]
    SVP New SVP applied in2016_t02_sst018
    2016-08-28 11:55 -34.3950 151.7253 EM122
    [view]
    SVP New SVP applied in2016_t02_sst019
    2016-08-28 13:02 TSG
    [view]
    Filter Clean
    2016-08-28 13:10 pCO2
    Filter Clean
    2016-08-28 17:36 -34.1278 151.6947 EK60
    [view]
    Start ADCP Set to synchronised EK60 new line number Investigator_EK60_-D20160828-T173349
    2016-08-28 17:46 -34.1140 151.6825 EM122
    [view]
    Stop Stop EM122 to stop Noise in EK60
    2016-08-28 17:49 -34.1140 151.6825 EK60
    [view]
    Stop Stop 75kHz ADCP
    2016-08-28 17:52 -34.1140 151.6825 EK60
    [view]
    Stop Stop 150kHz ADCP
    2016-08-28 17:55 -34.1140 151.6825 EK60
    [view]
    Stop All Sounders except EK60 off
    2016-08-28 18:00 -34.1140 151.6825 EK60
    [view]
    Stop 150kHz ADCP back on
    2016-08-28 18:13 -34.1140 151.6825 EK60
    [view]
    Stop 75kHz ADCP back on
    2016-08-28 18:34 -34.0537 151.6282 EM122
    [view]
    Start Start Pinging EM122
    2016-08-28 18:48 -34.0390 151.6103 EM710
    [view]
    Start Statrt Logging EM710
    2016-08-28 19:46 -33.9800 151.5383 EM122
    [view]
    Stop Stop Logging EM122
    2016-08-28 20:18 Instrument Clean Seawater pump
    [view]
    Stop Science Seawater pumps off 10 min only to allow engineers further test on TM pump
    2016-08-28 21:00 ADCP
    [view]
    Change Switched mode to match drop keel position (flush with hull)
    2016-08-28 21:10 drop keel
    [view]
    Recovered PS keel retracted to flush with hull, SB keel fully up (maint position)
    2016-08-28 23:34 -33.8615 151.2245 EM710
    [view]
    Stop Sttop Logging
    2016-08-29 00:17 Instrument Clean Seawater pump
    [view]
    Stop All science seawater pumps off after Sydney arrival

    Save this list as

    Deployments - No deployments have been recorded in the Data Trawler.

    O&A Information and Data Centre  »  Data Trawler