Please login if you have access to particular applications.
Event details
Voyage: | IN2015_C02 [details] | ||
Subject: | Re-synchronized in Ksync | ||
When: | 2015-12-02 17:17:43 UTC - entered into Elog/Everlog as 2015-12-02 17:17:43 | ||
Log: | GSM_in2015_c02 | ||
Equipment: | EK60
Simrad EK60 multi-frequency split-beam echosounder [view] | ||
Position: |
Latitude: -36.64217 Longitude: 135.987
- entered into Elog as 36°38.53'S, 135°59.22'E | ||
Action: | Start | ||
| |||
Comments: | Settings changed based on feedback from Simrad. EK60, EM122 and ADCP now synchrinized in a single group. EK60 set to 1s in runtime parameters. Installation parameters changed to uncheck Transmitting signal , SIgnal active was set to Active High and Pulse length set to 10ms. EK60 is set to maximise pinging. All systems now seem to be synchronized with EK60 pinging at a maximal rate (~5s) |