Please login if you have access to particular applications.
Event details
Voyage: | IN2016_V02 [details] | ||
Subject: | Tweaked pre-amp | ||
When: | 2016-04-12 02:23:20 UTC - entered into Elog/Everlog as 2016-04-12 02:23:20 | ||
Log: | GSM_in2016_v02 | ||
Equipment: | EM122
Kongsberg EM122 12kHz multibeam echo sounder [view] | ||
Position: | Latitude: -50.9159 Longitude: 151.0256 Position from underway logging | ||
Action: | Outage | ||
| |||
Comments: | Shutdown pre-amp and Steve Thomas adjusted two pots (current limiters marked I +/-) as suggested from Kongsberg (help request 010451790). Turned them to max clockwise and then back to 90% setting. Original setting was circa 50% and Kongsberg suggested the current limiter outage is possible when em122 andsbp120 are in sync. |