Please login if you have access to particular applications.
Event details
Voyage: | IN2018_V04 [details] |
When: | 2018-10-05 12:55:23 UTC - entered into Elog/Everlog as 2018-10-05 12:55:23 |
Log: | Coring_in2018_v04 |
Equipment: | Multi Core |
Position: |
Latitude: -46.803 Longitude: 142.253
- entered into Elog as 46 48.18 S, 142 15.18 E |
Action: | Deploy |
Wire Factor: | 1.07 |
Target Scope: | 4800 |
Pull out load: | 7.5 |
Total Scope: | 4705 |
Current Velocity: | 0.3 knots |
Core Length: | 0 |
Wind speed: | 29 knots |
Station name: | PS01-G2 |
Core name: | MC07 |
Notes: | 6 tubes loaded |
Comments: | camera attached but light failed during deployment. 6 tubes chosen following Kasten core. 50M/min - 4300 30M/min 4800 programed payout USBL depth 4434 at 4630 wire out USBL Depth 4520 - 4715 wire out 4505 - 4696 4550-4673 |