Please login if you have access to particular applications.
Event details
| Voyage: | IN2018_V04 [details] |
| When: | 2018-10-05 12:55:23 UTC - entered into Elog/Everlog as 2018-10-05 12:55:23 |
| Log: | Coring_in2018_v04 |
| Equipment: | Multi Core |
| Position: |
Latitude: -46.803 Longitude: 142.253
- entered into Elog as 46 48.18 S, 142 15.18 E |
| Action: | Deploy |
| Wire Factor: | 1.07 |
| Target Scope: | 4800 |
| Pull out load: | 7.5 |
| Total Scope: | 4705 |
| Current Velocity: | 0.3 knots |
| Core Length: | 0 |
| Wind speed: | 29 knots |
| Station name: | PS01-G2 |
| Core name: | MC07 |
| Notes: | 6 tubes loaded |
| Comments: | camera attached but light failed during deployment. 6 tubes chosen following Kasten core. 50M/min - 4300 30M/min 4800 programed payout USBL depth 4434 at 4630 wire out USBL Depth 4520 - 4715 wire out 4505 - 4696 4550-4673 |