Please login if you have access to particular applications.
Event details
Voyage: | IN2018_V04 [details] |
When: | 2018-10-04 23:34:11 UTC - entered into Elog/Everlog as 2018-10-04 23:34:11 |
Log: | Coring_in2018_v04 |
Equipment: | Multi Core |
Position: |
Latitude: -46.8465 Longitude: 141.29667
- entered into Elog as 46 50.79 S, 141 17.8 E |
Action: | Deploy |
Wire Factor: | 1.08 |
Target Scope: | 4393 |
Pull out load: | 6.41 |
Total Scope: | 4290 |
Current Velocity: | 0.2 knots |
Core Length: | 0 |
Wind speed: | 17 knots |
Station name: | PS01 |
Core name: | MC06 |
Notes: | 4 tubes loaded, camera on |
Attachment: | 181005_154321_2018-10-06_01_42_40-MC06.png |
Into seafloor at 11: | 13 and 4290 m wire out |
Out of seafloor at 11: | 21 and 4275 wire out. |
Comments: | Slowing at 4000 m wire out to 30 m/min Continue on from there until the tension drops then 20 more m. Beacon not working so flying blind Yay! Into seafloor at 11:13 and 4290 m wire out Out of seafloor at 11:21 and 4275 wire out. |