Please login if you have access to particular applications.
Event details
Voyage: | IN2018_V04 [details] |
When: | 2018-09-20 10:19:18 UTC - entered into Elog/Everlog as 2018-09-20 10:19:18 |
Log: | Coring_in2018_v04 |
Equipment: | Multi Core |
Position: |
Latitude: -40.29183 Longitude: 153.5065
- entered into Elog as 40 17.51 S, 153 30.39 E |
Action: | At sea floor |
Wire Factor: | 1.06 |
Target Scope: | 3550 |
Pull out load: | 5.7 |
Total Scope: | 3358 |
Station name: | PS03 |
Core name: | MC02 |
Notes: | 4 out of 4 Good samples taken |
Attachment: | 180920_163058_2018-09-20_20_38_41-Greenshot.png,180920_163341_2018-09-21_02_33_16-Grafana_-_Geoscience.png |
Engineers doing cal. on winch during bottom time. 20: | 37 |
Comments: | 4T load. Engineers doing cal. on winch during bottom time. 20:28 -_20:37 1/2 turn added to check spooling USBL switch failed to change from 5203 to 5204 USBL switch magnet pulled out |