Voyage: IN2019_V04       [details]
Subject: Mass Flow Controller
When: 2019-08-09 01:24:04 UTC

- entered into Elog/Everlog as 2019-08-09 01:24:04
Log: in2019_v04_Atmospherics
Equipment: CPC 3772

Condensation Particle Counter (TSI 3772) [view]
Position: Latitude: -21.01717 Longitude: 154.33067

- entered into Elog as 21 01.03 S, 154 19.84 E
Action: Fault
Mass flow control display was not illuminated:Checked input power and the plug to the control unit was not seated correctly. 
Comments:

Mass flow control display was not illuminated: Checked input power and the plug to the control unit was not seated correctly.

Seated power plug and set display to "flow"