Data Trawler - Event Details

Please login if you have access to particular applications.
Username:
Password:

Event details

Voyage: IN2020_V01       [details]
When: 2020-02-29 13:38:52 UTC

- entered into Elog/Everlog as 2020-02-29 13:38:52
Log: Updated Dredge in2020_v01
Equipment: Not specified
Position: Latitude: -32.76883 Longitude: 101.07383

- entered into Elog as 32 46.13 S, 101 04.43 E
Dredge Number:D19
Wind Direction (deg):7.71
Planned Heading (deg):160
Dip Direction of Slope (deg):020
Current Velocity (m/min):3.0
Current Direction (deg):245
WP2 Depth (m):4250
Ellipsoidal Distance (metres):1100
WP1 to WP2 (metres):1340
WP3 Target Wire Out (m):4873
Speed Through Water Average (WP1 to WP2) (knots):0.3
Speed Over Ground Average (WP2 to WP3) (knots):0.3
WP3 Actual Wire Out (m):4871
Ship speed at retrival (knots):0.4
Ship speed at retrival (m/min) (auto-filled):12.35
Retrival Wire Speed (m/min):15
Wire Out at First Tension Spike (m):4869
Tension Max (Tonnes):12.5
Hung Up:Yes
Wire Out Off Bottom (meters):3700
Overall Operation Rating:7
Completion Time:30
Attachment:200229_142335_D19_start_of_dredge.JPG,200229_173650_D19_grafana_retrieval_of_dredge.JPG
Dredge in water at 13:39. Using stop-and-drop technique for dredge in-water approach.
Start paying wire out (60 m/min) at 13:44.
Dredge on bottom at 14:59, wire out 4175 (+100m sacrificial).
Paying out 30m/min along dredge trajectory starting at:21.
Commence dredge haul in (-15m/min) at 15:30.
Tension spikes:52 (wire out 3950m, depth 3870m); 
Dredge off bottom at 17:08 wire out 3700m, depth 3848m pos 101.07,-32.77. Haul in at 30m/min.
Haul in at 60 m/min at ;17:12.
Dredge at surface at 18:30. Major knot present on sacrificial wire.
Comments:

Dredge in water at 13:39. Using stop-and-drop technique for dredge in-water approach.

Dredge bottom start (WP2) is at 101 4.497,-32 46.192 at a target depth of 4250m. Planned WP3 is 101 4.781,-32 46.756.

Wind is ~13 knts from 130.

Start paying wire out (60 m/min) at 13:44.

Dredge on bottom at 14:59, wire out 4175 (+100m sacrificial).

Paying out 30m/min along dredge trajectory starting at: 15:03. Stop paying out at: 15:21.

Commence dredge haul in (-15m/min) at 15:30.

Tension spikes: 10.6t at 15:30; 10.9 at 15:32; 11.1 at 15:33; 10.9 at 15:36; 11.5 at 15:38; 11 at 15:40; 11.3 at 15:42; 11 at 15:44; 11.5 at 15:46; 11 at 15:48; 11.3 at 15:51; 11.4 at 15:53; 11.7 at 15:54; 11.9 at 15:56; 11.4 at 15:56; 11.5 at 15:59; 11.7 at 16:01; 11.9 at 16:03; 11.8 at 16:04; 12.5 at 16:06; 12.5 at 16:08 - hookup, paying out at 16:11; unhooked at 16:15, wire out 4260m; 12.4 at 16:16; 12.4 at 16:18; 12.4 at 16:20 - hookup (wire out 4185m); unhooked at 16:26; 11.2 at 16:31; 12.3 at 16:32; 12.2 at 16:35 - hookup (wire out ~4035m); moving slightly downslope (to north) to unhook; unhooked at 16:52 (wire out 3950m, depth 3870m);

Dredge off bottom at 17:08 wire out 3700m, depth 3848m pos 101.07,-32.77. Haul in at 30m/min.

Haul in at 60 m/min at 17:12.

Dredge at surface at 18:14. Onboard at 18:30. Major knot present on sacrificial wire.

NCMI Information and Data Centre  »  Applications  »  Data Trawler