Voyage: IN2020_V01       [details]
When: 2020-02-19 13:28:13 UTC

- entered into Elog/Everlog as 2020-02-19 13:28:13
Log: Updated Dredge in2020_v01
Equipment: Not specified
Position: Latitude: -32.01083 Longitude: 96.168

- entered into Elog as 32 00.65 S, 96 10.08 E
Dredge Number:D15
Wind Direction (deg):7.76
Planned Heading (deg):030
Dip Direction of Slope (deg):120
Current Velocity (m/min):9
Current Direction (deg):359
WP2 Depth (m):2270
WP3 Depth (m):1454
Ellipsoidal Distance (metres):1250
Target Wire Factor:1.0 x WP2 water depth + 150m
WP3 Target Wire Out (m):3354
Speed Through Water Average (WP1 to WP2) (knots):0.25
Speed Over Ground Average (WP2 to WP3) (knots):1.3
WP3 Actual Wire Out (m):3354
Ship speed at retrival (knots):0.3
Retrival Wire Speed (m/min):15
Wire Out at First Tension Spike (m):3354
Tension Max (Tonnes):10.6
Hung Up:Yes
Wire Out Off Bottom (meters):1870
Overall Operation Rating:7
Completion Time:45
Attachment:200219_140724_D15_start_of_dredge_haul.JPG,200219_172038_D15_grafana_retrieval_of_dredge.JPG
Dredge in water 13:29 (96.168,-32.01).
Start paying out 60m/min 13:35 (depth 2291m).
Dredge on bottom ~14:11. Start paying out wire along dredge line at 30m/min.
Target wire laid out 3354m at 14:48, ship at 96.180,-32.005. water depth 1432m.
Start hauling (15m/min) ;in 14:56, wire out 3345m.
Tension spikes:05.
Dredge at surface at 17:45.
Comments:

We will be using a "stop-and-drop" technique for this dredge D15 deployment. Therefore, some of the above fields are not filled in - there is no fly-in ship-approach used for WP1 to WP2 "run-in" - or may not be valid for the & 39;modelling& 39; intended. The ship is using the current and ship rudder control to drift towards WP2 while the dredge is being lowered. Viewing ship-track data post deloyment will show the approach track.

Target dredge start (WP2) is (96 10.113, -32 00.628)

Dredge in water 13:29 (96.168,-32.01).

Start paying out 60m/min 13:35 (depth 2291m).

Dredge on bottom ~14:11. Start paying out wire along dredge line at 30m/min.

Target wire laid out 3354m at 14:48, ship at 96.180,-32.005. water depth 1432m.

Start hauling (15m/min) in 14:56, wire out 3345m.

Tension spikes: 5.7t at 14:57; 5.8 at 15:00; 6 at 15:02; 6.2 at 15:04; 5.9 at 15:06; 6 at 15:08; 6 at 15:10; 6 at 15:12; 6.4 at 15:14; 6.1 at 15:17; 6.5 at 15:19; 6.6 at 15:21; 6.4 at 15:25; 6.24at 15:31; 6.5 at 15:34; 6.2 at 15:37; 7.2 at 15:39; 7.6 at 15:40; 7.9 at 15:41; 8 at 15:42; 7.2 at 15:45; 8.0 at 15:51; 7.9 at 15:52; 8.5 at 15:53; 8.7 at 15:54; 6.9 at 15:58; 7 at 15:59; 7 at 16:01; 6 at 16:14; 9.0 at 16:20; 10.6 at 16:21 - hookup (2056m wire out)...unhooked at 16:27; 10.4 at 16:33 - hookup (1945m wire out); off the bottom 17:02:10 (wire out 1868); hauling in at 60m/min at 17:05.

NB. Ship moved down-slope for last hookup so as to unhook.

Dredge at surface at 17:42 - on deck at 17:45.