Please login if you have access to particular applications.
Event details
Voyage: | IN2020_E01 [details] |
Subject: | USBL Calibration Complete_DPT on deck |
When: | 2020-08-02 06:34:44 UTC - entered into Elog/Everlog as 2020-08-02 06:34:44 |
Log: | GSM_in2020_e01 |
Equipment: | Other
Profiling Lagrangian Acoustic Optical System [view] |
Station/Location: | Storm Bay |
Position: |
Latitude: -43.461 Longitude: 148.0835
- entered into Elog as 43 27.66 S, 148 05.01 E |
Action: | Stop |
Seastate: | 5 |
Depth: | 128 Wire out: 140m |