Deployment Details
Survey: - FR198906 [details]
Deployment Type: - Underway System
Gear: Simrad EA500 Echosounder
When: 1989-05-11 00:00 to 1989-05-14 23:55 UTC
Where:
29° 36.6' S
153° 24.4' E
to
33° 49.7' S
151° 16.4' E
Maximum Depth (m): unknown
Comments: sakova
Gear / Instruments used.
Instrument | Manufacturer | Model | Serial No | Measuring |
---|---|---|---|---|
Simrad EA500 Echosounder | Simrad | EA500 | Depth (m) |