Please login if you have access to particular applications.
Search for events by voyage, equipment, action or within comments.
Event count for each voyage, equipment or action is shown in ().
Events ordered by start time:- Click on column header to sort. Use link on 'When' to see full details. Use the CSV button at the bottom to export data.
Survey | When (UTC) | Latitude | Longitude | Instrument | Identifier | Action | Log | Subject / Comments |
---|---|---|---|---|---|---|---|---|
IN2016_E01 | 2016-08-19 05:21 [view ] | -43.8097 | 150.5882 | SMPS [view] | Start | in2016_e01 | Restarted scheduler Noted that this instrument was not running despite being started at the beginning of the voyage. | |
IN2016_V03 | 2016-04-26 11:54 [view ] | -43.0635 | 147.3946 | SMPS [view] | Start | Atmos_in2016_v03 | Sampling started Started sampling with Long TSI SMPS | |
IN2016_V03 | 2016-05-14 03:15 [view ] | -57.0082 | -170.0010 | SMPS [view] | Flow check | Atmos_in2016_v03 | TSI Long SMPS Disconnected from inlet. Inlet capped. Flow & zero checks. Silica replaced. Reconnected at 03:43UTC | |
IN2016_V03 | 2016-05-14 03:49 [view ] | -57.0098 | -170.0016 | SMPS [view] | Flow check | Atmos_in2016_v03 | GRIMM NanoSMPS checks Disconnected from inlet. Inlet tap closed. Flow check. Reconnected at 03:50UTC | |
IN2016_V03 | 2016-05-18 02:39 [view ] | -50.8378 | -170.0117 | SMPS [view] | Flow check | Atmos_in2016_v03 | TSI Long SMPS Disconnected and capped aerosol sampling line. Flow & zero checks. Re-connected to inlet at 02:49UTC | |
IN2016_V03 | 2016-05-18 02:54 [view ] | -50.7857 | -170.0090 | SMPS [view] | Flow check | Atmos_in2016_v03 | GRIMM NanoSMPS checks Disconnected aerosol sampling line and closed valve. Flow check. Reconnected at 02:55UTC | |
IN2016_V03 | 2016-05-22 01:50 [view ] | -45.1760 | -172.7364 | SMPS [view] | Flow check | Atmos_in2016_v03 | TSI Long SMPS Disconnected and capped aerosol sampling line. Flow check. Reconnected sampling line at 02:03 | |
IN2016_V03 | 2016-05-22 02:20 [view ] | -45.1750 | -172.7383 | SMPS [view] | Flow check | Atmos_in2016_v03 | GRIMM NanoSMPS checks Disconnected aerosol sampling line and closed valve. Flow check. Reconnected sampling line at 02:21UTC | |
IN2016_V03 | 2016-05-23 04:35 [view ] | -44.1562 | -173.9371 | SMPS [view] | Stop | Atmos_in2016_v03 | TSI Long SMPS Stopped sampling to replace silica on makeup line. Restarted sampling at 4:42UTC | |
IN2017_T01 | 2017-09-29 17:46 [view ] | -13.1356 | 147.8796 | SMPS [view] | Stop | in2017_t01 | SMPS stopped due to high RH | |
IN2017_T02 | 2017-11-14 22:08 [view ] | -34.7162 | 115.1207 | SMPS [view] | maintenance | in2017_t02 | settings changed, schedule restarted changed D Max Scan from 350 to 1093.95 (full length scan) | |
IN2017_T02 | 2017-11-15 04:12 [view ] | -35.1125 | 116.4495 | SMPS [view] | maintenance | in2017_t02 | attempt restart - failed keeps failing if D Max Scan is set to 1093. tried again but it failed | |
IN2018_C01 | 2018-06-02 13:45 [view ] | -39.1823 | 146.4858 | SMPS [view] | Fault | Atmospherics_in2018_c01 | Removed due to DMA fault. | |
IN2018_T01 | 2018-04-13 03:00 [view ] | -30.7582 | 154.1065 | SMPS [view] | Start | in2018_t01 | ||
IN2018_V01 | 2018-01-25 11:25 [view ] | -58.3519 | 139.8523 | SMPS GRIMM [view] | Atmospherics in2018_v01 | Flow check 294 ccm | ||
IN2018_V01 | 2018-01-31 00:40 [view ] | -64.8106 | 139.8592 | SMPS GRIMM [view] | Atmospherics in2018_v01 | Took off sampling line for zero and flow check | ||
IN2018_V01 | 2018-02-11 04:59 [view ] | -62.5001 | 132.0497 | SMPS GRIMM [view] | Atmospherics in2018_v01 | Taken offline for zero and flow check for 2 minutes Flow 295.7 ccm Zero OK | ||
IN2018_V01 | 2018-02-16 04:53 [view ] | -57.9304 | 131.9816 | SMPS GRIMM [view] | Atmospherics in2018_v01 | Taken offline for zero and flow check Flow 290 ccm Zero OK | ||
IN2018_V01 | 2018-02-21 20:20 [view ] | -42.9358 | 147.3883 | SMPS GRIMM [view] | Atmospherics in2018_v01 | Final flow and zero checks Inlet flow - 292 Inlet flow (inline with manifold) - 294 Zero OK | ||
IN2018_V06 | 2018-12-05 02:34 [view ] | -43.8892 | 147.2312 | SMPS [view] | Outage | in2018_v06_Atmospherics | Software crshed on 2/12/18 Found that the software had crashed on 2/12. Software restarted | |
IN2018_V06 | 2018-12-07 03:29 [view ] | -44.2318 | 146.1712 | SMPS [view] | Fault | in2018_v06_Atmospherics | Software crashed | |
IN2018_V06 | 2018-12-08 00:19 [view ] | -44.2123 | 146.2067 | SMPS [view] | Fault | in2018_v06_Atmospherics | Software crashed | |
IN2018_V06 | 2018-12-09 17:03 [view ] | -44.3700 | 147.2028 | SMPS [view] | Outage | in2018_v06_Atmospherics | downtime to install wiretap SMPS was temporarily offline to allow for installation of "wiretap" code to sniff live data | |
IN2018_V06 | 2018-12-09 18:27 [view ] | -44.2985 | 147.0810 | SMPS [view] | Outage | in2018_v06_Atmospherics | downtime to update wiretap | |
IN2018_V06 | 2018-12-14 16:02 [view ] | -44.1905 | 147.3198 | SMPS [view] | Maintenance | in2018_v06_Atmospherics | Butanol refill added about 1/4 bottle. Should be sufficient for the remainder of the voyage | |
IN2019_E01 | 2019-07-21 09:08 [view ] | SMPS [view] | Maintenance | in2019_e01_Atmospherics | Running overnight zero, starting at measurement 15 or 10:17am | |||
IN2019_E01 | 2019-07-21 15:00 [view ] | SMPS [view] | Maintenance | in2019_e01_Atmospherics | Annual maintenance SMPS maintenance including: - Cleaning the external impactors with kimwipe and alcohol - the nozzle on the impactor (not the preimpactor) may have been installed backwards. See new procedure for proper installation. - Cleaning the impactor at the top of the column with kimwipe and alcohol. - Reapplicaiton of a thin layer of grease to all the impactors - Cleaning of the DMA and all surfaces with kimwipes and alcohol. The DMA itself was very clean, and it was just the sections around the external screws that had a bit of corrosion on them. The brass connections looked reasonable, however one side (presumably the inlet) was dirty on the inside. - Changed the excess air filter with a new one. | |||
IN2019_E01 | 2019-07-22 01:41 [view ] | SMPS [view] | Maintenance | in2019_e01_Atmospherics | Overnight zero check Completed overnight zero check. Total concentrations averaged about 5e-1, with a max of 1.5e0. This is acceptable. | |||
IN2019_E01 | 2019-07-22 02:18 [view ] | SMPS [view] | Maintenance | in2019_e01_Atmospherics | Flow check Gilibrator flow check - 293.1 ccm from 6 points. Only small deviation around this of approx +/- 1 ccm. Goal is 300 ccm, so this is acceptable within 5%. | |||
IN2019_E01 | 2019-07-22 02:20 [view ] | SMPS [view] | Maintenance | in2019_e01_Atmospherics | SMPS operation Leaving SMPS on, measuring lab air, until the PSL cal is performed in a few days. | |||
IN2019_E01 | 2019-07-27 23:34 [view ] | -9.8958 | 135.2510 | SMPS [view] | Maintenance | in2019_e01_Atmospherics | Flow check Gilibrator flow check at inlet - 0.280 LPM | |
IN2019_E01 | 2019-07-28 00:36 [view ] | -9.9207 | 135.3300 | SMPS [view] | Maintenance | in2019_e01_Atmospherics | butanol filled and emptied | |
IN2019_E01 | 2019-07-28 02:16 [view ] | -9.9538 | 135.4350 | SMPS [view] | Fault | in2019_e01_Atmospherics | Condenser temperature not reaching setpoint Butanol ran out (error 40) overnight. I refiled it and the signal came back good but error 32 is persisting (temperatures not reaching setpoint). I tried restarting the software and running the warmup, but the condenser temperature is not reaching the setpoint (10oC), and only making it to 14oC. I power cycled the instrument, leaving it off for about 30 minutes, then unplugging it from mains power for about 1 minute, before restarting (without the software). Checked about 45 min later, and the condenser temperature is down to 11.8oC. Leaving it for a while longer to see if it gets down to temperature. Left another 45 min, temperature hasn& 39;t gone any further down. Took cover off to inspect plumbing, nothing suspicious, but the air conditioner is blowing directly on the instrument - maybe the heater dump for the temperature isn& 39;t able to work against the 21oC AC. I& 39;ve readjusted the AC flow direction flaps to point directly out, rather than down as they were. No change after 15 minutes. It could be related to the humidity or some dodgy butanol - I& 39;ve connected the diffusion drier to the inlet (still sampling lab air) to test the humidity effect. No change. Leaving overnight to see if the wick wetting is the issue (removed the diffusion drier). | |
IN2019_E01 | 2019-07-28 06:42 [view ] | -10.1790 | 136.1513 | SMPS [view] | Fault | in2019_e01_Atmospherics | Power cycled the instrument to try to get condenser temp to set point This helped it get down to 11.2oC now after 45 minutes. Power cycling again to see if I can get it that little bit further! | |
IN2019_E01 | 2019-07-29 00:01 [view ] | -11.1717 | 139.4788 | SMPS [view] | Fault | in2019_e01_Atmospherics | Condenser temperature still out of range Came in in the morning to find the condenser temperature at 15 degrees. The software has been having trouble connecting, so maybe this is a standby mode feature? I have restarted the instrument and the PC to see if I have any luck. | |
IN2019_E01 | 2019-07-29 01:27 [view ] | -11.1222 | 139.7778 | SMPS [view] | Fault | in2019_e01_Atmospherics | Condenser temp I& 39;ve pulled the SMPS out in order to dry the wick. Disconnected the DMA to pull it out. Taken it to dry lab. Disconnected the CPC (lots of cables!) and removed it (4 screws underneath) and relocated the CPC to the fume hood. Removed the top cover of the optics, one of the tiny circuit boards blocking one of the screws for the front plate, then removed the front plate and foam, removed the inlet protecting the saturator block and then removed the wick with tweezers. The wick is a slightly yellow colour, not sure if it was originally white or what, but it may be discoloured. Leaving in the fume hood for the day. Might put in the oven overnight to drive the last bit of the water out. | |
IN2019_E01 | 2019-07-30 04:06 [view ] | -9.4642 | 144.4663 | SMPS [view] | Maintenance | in2019_e01_Atmospherics | PSL cal at 303 +/- 6 nm started Condenser temperature at 18.2oC (set point of 10oC). | |
IN2019_E01 | 2019-07-30 04:14 [view ] | -9.4860 | 144.4840 | SMPS [view] | Maintenance | in2019_e01_Atmospherics | PSL cal at 100 +/- 3 nm started | |
IN2019_E01 | 2019-07-30 04:17 [view ] | -9.4860 | 144.4840 | SMPS [view] | Maintenance | in2019_e01_Atmospherics | PSL cal at 508 +/- 8 nm started | |
IN2019_E01 | 2019-07-30 04:21 [view ] | -9.4860 | 144.4840 | SMPS [view] | Maintenance | in2019_e01_Atmospherics | PSL cal at 81 +/- 3 nm started | |
IN2019_E01 | 2019-08-01 00:26 [view ] | -13.8877 | 146.0652 | SMPS [view] | Outage | in2019_e01_Atmospherics | Switched instrument off to packup for repair Error 32 suggests that the peltier cooler is broken and GRIMM are asking to send it back to them in Germany. Ian is going to try to fix it in Hobart before sending it back, so I& 39;m packing everything up, including the PC. | |
IN2019_T01 | 2019-04-29 01:24 [view ] | -43.3642 | 147.4790 | SMPS [view] | Maintenance | in2019_t01_Atmospherics | Butanol refill | |
IN2019_V01 | 2019-01-30 04:00 [view ] | -64.7083 | 138.5850 | SMPS [view] | Maintenance | in2019_v01_Atmospherics | butanol fill | |
IN2019_V01 | 2019-02-02 18:14 [view ] | -65.8125 | 144.3650 | SMPS [view] | Maintenance | in2019_v01_Atmospherics | Topped up butinol | |
IN2019_V01 | 2019-02-04 19:01 [view ] | -65.7862 | 143.9258 | SMPS [view] | Maintenance | in2019_v01_Atmospherics | Butanol Refill | |
IN2019_V01 | 2019-02-08 20:06 [view ] | -65.8650 | 146.9652 | SMPS [view] | Maintenance | in2019_v01_Atmospherics | Butanol Refill | |
IN2019_V01 | 2019-02-17 19:33 [view ] | -65.9437 | 148.2963 | SMPS [view] | Maintenance | in2019_v01_Atmospherics | catchpot drained | |
IN2019_V01 | 2019-02-23 17:45 [view ] | -65.7455 | 147.1073 | SMPS [view] | Maintenance | in2019_v01_Atmospherics | Butinol Refill and Cear Waste | |
IN2019_V01 | 2019-03-02 16:42 [view ] | -48.2683 | 148.0028 | SMPS [view] | Maintenance | in2019_v01_Atmospherics | Butinol Refill and Cear Waste | |
IN2019_V02 | 2019-03-26 18:00 [view ] | -46.8880 | 142.1828 | SMPS [view] | Observation | in2019_v02_Atmospherics | SMPS showing minute readings | |
IN2019_V03 | 2019-05-15 11:49 [view ] | -34.7048 | 113.3088 | SMPS [view] | Maintenance | in2019_v03_Atmospherics | butanol fill | |
IN2019_V03 | 2019-05-29 00:29 [view ] | -21.5005 | 110.0003 | SMPS [view] | Maintenance | in2019_v03_Atmospherics | Butanol Refill | |
IN2019_V03 | 2019-06-07 20:53 [view ] | -16.8372 | 111.3282 | SMPS [view] | Maintenance | in2019_v03_Atmospherics | Butanol Refill | |
IN2019_V03 | 2019-06-12 08:18 [view ] | -28.4538 | 113.4797 | SMPS [view] | Stop | in2019_v03_Atmospherics | Shut down for dry dock | |
IN2019_V06 | 2019-10-23 01:16 [view ] | -14.3740 | 121.2547 | SMPS [view] | AIRBOX_in2019_v06 | 3782 Emtied drain bottle Filled supply bottle. | ||
IN2019_V06 | 2019-10-23 03:01 [view ] | -14.3708 | 121.2512 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Restarting Restarting AIM | |
IN2019_V06 | 2019-10-23 03:06 [view ] | -14.3633 | 121.2428 | SMPS [view] | Start | AIRBOX_in2019_v06 | Restarting Starting a new file: 20191023.s80 | |
IN2019_V06 | 2019-10-24 04:50 [view ] | -14.3385 | 121.2898 | SMPS [view] | Fault | AIRBOX_in2019_v06 | leak Branka was pulling NAIS tubes off and disconnected something. Stopped sampling | |
IN2019_V06 | 2019-10-24 05:22 [view ] | -14.2655 | 121.2908 | SMPS [view] | Start | AIRBOX_in2019_v06 | Restarted after reconnecting | |
IN2019_V06 | 2019-10-25 00:54 [view ] | -14.2702 | 121.2127 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Starting new file name 20191025.s80 | |
IN2019_V06 | 2019-10-25 06:59 [view ] | -14.2758 | 121.2368 | SMPS [view] | Restart | AIRBOX_in2019_v06 | A vacuum line fell of and the SMPS stoped couting - repaired and restarted | |
IN2019_V06 | 2019-10-26 01:35 [view ] | -14.1797 | 121.2193 | SMPS [view] | Fault | AIRBOX_in2019_v06 | AIM stopped scanning at 286 AIM stoped also for the VH-TDMA at the same time. Restarting SMPS | |
IN2019_V06 | 2019-10-26 10:37 [view ] | -14.0427 | 122.2243 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Changed file name | |
IN2019_V06 | 2019-10-26 11:28 [view ] | -13.9903 | 122.1742 | SMPS [view] | AIRBOX_in2019_v06 | Counts gone down almost half | ||
IN2019_V06 | 2019-10-26 11:49 [view ] | -13.9767 | 122.1600 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow cheks STOPPED AFTER FROM 156 | |
IN2019_V06 | 2019-10-27 00:39 [view ] | -13.4555 | 121.5483 | SMPS [view] | Start | AIRBOX_in2019_v06 | Restarting AIM new file 20191027.s80 | |
IN2019_V06 | 2019-10-28 04:59 [view ] | -13.4900 | 121.5302 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow cheks Flows OK aerosol 0.27lpm, changed filename 20191028.s80 | |
IN2019_V06 | 2019-10-28 23:44 [view ] | -13.4888 | 121.5292 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow cheks All OK, see excell file | |
IN2019_V06 | 2019-10-29 00:05 [view ] | -13.4883 | 121.5282 | SMPS [view] | AIRBOX_in2019_v06 | drsaining CPC Restarted both labview and AIM. Draining 3772 on the H-side and put it on water removal | ||
IN2019_V06 | 2019-10-29 23:14 [view ] | -13.7980 | 121.9582 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daiy checks | |
IN2019_V06 | 2019-10-30 23:09 [view ] | -13.7982 | 121.9575 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | File change in AIM | |
IN2019_V06 | 2019-10-30 23:35 [view ] | -13.7983 | 121.9583 | SMPS [view] | Start | AIRBOX_in2019_v06 | restarted after daily checks | |
IN2019_V06 | 2019-10-31 23:28 [view ] | -13.4993 | 121.6148 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow cheks | |
IN2019_V06 | 2019-11-01 02:18 [view ] | -13.6453 | 121.4902 | SMPS [view] | Observation | AIRBOX_in2019_v06 | Flow changed after adding CPC Had to adjust flow | |
IN2019_V06 | 2019-11-01 23:07 [view ] | -14.3567 | 121.3950 | SMPS [view] | Change | AIRBOX_in2019_v06 | Instaling an impactor | |
IN2019_V06 | 2019-11-01 23:53 [view ] | -14.2748 | 121.4257 | SMPS [view] | Start | AIRBOX_in2019_v06 | Restarted with impactor | |
IN2019_V06 | 2019-11-03 09:14 [view ] | -14.2013 | 121.3422 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change All same as yesterday - see excell file | |
IN2019_V06 | 2019-11-04 00:01 [view ] | -14.2908 | 121.4620 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow cheks and file name change | |
IN2019_V06 | 2019-11-05 00:36 [view ] | -14.2433 | 121.9592 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-11-06 23:29 [view ] | -13.7973 | 121.9577 | SMPS [view] | Start | AIRBOX_in2019_v06 | restarted after daily checks | |
IN2019_V06 | 2019-11-08 00:20 [view ] | -13.8775 | 121.7593 | SMPS [view] | AIRBOX_in2019_v06 | Changed file name | ||
IN2019_V06 | 2019-11-08 22:55 [view ] | -13.2897 | 124.0895 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-11-08 23:11 [view ] | -13.2822 | 124.1465 | SMPS [view] | Start | AIRBOX_in2019_v06 | restarted after daily checks | |
IN2019_V06 | 2019-11-09 23:56 [view ] | -12.4290 | 129.5855 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-11-10 00:01 [view ] | -12.4262 | 129.6048 | SMPS [view] | Start | AIRBOX_in2019_v06 | restarted after daily checks | |
IN2019_V06 | 2019-11-10 06:14 [view ] | -12.3088 | 130.6337 | SMPS [view] | Fault | AIRBOX_in2019_v06 | Placed dry air on Nafion CPC shows large counts after I placed dry air on nafion to blow | |
IN2019_V06 | 2019-11-10 06:24 [view ] | -12.3122 | 130.6435 | SMPS [view] | Start | AIRBOX_in2019_v06 | Restarted | |
IN2019_V06 | 2019-11-10 22:36 [view ] | -12.4723 | 130.8455 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change All ok | |
IN2019_V06 | 2019-11-11 23:05 [view ] | -10.8468 | 130.1158 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily checks and file name change | |
IN2019_V06 | 2019-11-13 22:30 [view ] | -11.2097 | 133.4368 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily checks and file name change | |
IN2019_V06 | 2019-11-14 00:47 [view ] | -11.2068 | 133.4307 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Orifice blocked (fixed) Poly flow was 0.21, adjusted sheath flow knob until 0.31. This lowered sheath flow to 1.66 (2.42 on classifier). After attempting to correct this (with no success) we found the critical orifice was blocked. We cleaned it and found sheath flow had risen to 2.9. Adjusted excess and sheath flows until all were normal again | |
IN2019_V06 | 2019-11-15 23:45 [view ] | -11.2062 | 133.4440 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-11-16 22:57 [view ] | -11.2075 | 133.4355 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-11-18 22:48 [view ] | -12.1645 | 130.8462 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-11-19 22:58 [view ] | -12.0968 | 130.6398 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-11-21 22:48 [view ] | -12.3205 | 130.3985 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-11-22 22:34 [view ] | -12.3100 | 130.4010 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-11-24 22:51 [view ] | -12.2932 | 130.3867 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-11-25 22:21 [view ] | -12.3098 | 130.4128 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-11-26 23:04 [view ] | -10.8298 | 132.1785 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-11-29 22:37 [view ] | -12.3107 | 130.4113 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-11-30 23:12 [view ] | -12.3138 | 130.4068 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-12-03 21:59 [view ] | -12.3117 | 130.4120 | SMPS [view] | Fault | AIRBOX_in2019_v06 | Failed to set scan time Checked SMPS distrbution for daily checks. Had the error "Failed to set scan time: not sampling". Unsure of how long it had this error/how long there was no sampling | |
IN2019_V06 | 2019-12-07 22:26 [view ] | -12.3148 | 130.4270 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-12-08 22:53 [view ] | -12.3070 | 130.4308 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-12-09 22:35 [view ] | -12.6177 | 130.1193 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-12-10 22:40 [view ] | -12.3037 | 130.4232 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-12-11 22:29 [view ] | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |||
IN2019_V06 | 2019-12-13 23:21 [view ] | -12.3087 | 130.4348 | SMPS [view] | Maintenance | AIRBOX_in2019_v06 | Daily flow check and file name change | |
IN2019_V06 | 2019-12-14 09:43 [view ] | -12.3115 | 130.4245 | SMPS [view] | Stop | AIRBOX_in2019_v06 | End of sampling shutdown | |
IN2019_V07 | 2019-04-13 23:25 [view ] | -39.2332 | 146.6352 | SMPS [view] | Maintenance | Atmospherics_in2019_v07 | Empty butonol, fill butonol reservoir | |
IN2019_V07 | 2019-04-13 23:25 [view ] | -39.2332 | 146.6352 | SMPS [view] | Maintenance | in2019_v07_Atmospherics | Empty butonol, fill butonol reservoir | |
IN2020_E01 | 2020-08-03 13:38 [view ] | -43.1653 | 148.1888 | SMPS [view] | Maintenance | in2020_e01_Atmospherics | Butanol filled and emptied | |
IN2020_V06 | 2020-10-14 14:42 [view ] | -54.3185 | 159.1818 | SMPS [view] | Fault | in2020_v06_Atmospherics | SMPS software frozen. SMPS software found to be frozen and no data being produced for the last few days. Tried to restart but software wouldn& 39;t behave. Awaiting advice from Aspendale. | |
IN2020_V06 | 2020-10-15 00:00 [view ] | -54.6195 | 158.9335 | SMPS [view] | Start | in2020_v06_Atmospherics | Cycled power and restarted data acquisition. | |
IN2020_V06 | 2020-10-21 02:51 [view ] | -55.1440 | 157.5807 | SMPS [view] | Maintenance | in2020_v06_Atmospherics | Topped up butanol | |
IN2020_V06 | 2020-11-02 05:26 [view ] | -44.2395 | 149.4075 | SMPS [view] | Maintenance | in2020_v06_Atmospherics | Butanol filled/drained. | |
IN2020_V08 | 2021-01-12 07:57 [view ] | -51.4925 | 144.2710 | SMPS [view] | Maintenance | Atmospherics_in2020_v08 | Butanol refill only did a half top up last time, so finishing it up now | |
IN2021_T01 | 2021-06-13 18:55 [view ] | -19.0912 | 149.9110 | SMPS [view] | Start | Atmospherics | connected to inlet and switched on | |
IN2021_T01 | 2021-06-13 18:55 [view ] | -19.0912 | 149.9112 | SMPS [view] | Fault | Atmospherics | not connected properly - air leak ino aerosol systems 16/6 23:26 - I just found that the air inlet tube was not connected properly. air has been sucked into the sampling system since I connected up the SMPS on 13/6 18:55. This will have affected the SMPS, and CPCs. It is possible that it will have affected the.nephelometer and CCNC. It is possible, but I think unlikely, that it also affected the ozone and greenhouse gas system, depending on the interactions in the manifold and sample lines. | |
IN2021_T01 | 2021-06-16 23:24 [view ] | -11.8753 | 145.0560 | SMPS [view] | Maintenance | Atmospherics | Flow test Flow test with Gilibrtor :(2x average of 5 samples, cc/min) without impactors : 284, 292 with impactors: 275, 275 | |
IN2021_T01 | 2021-06-21 07:46 [view ] | -10.7568 | 134.1223 | SMPS [view] | Maintenance | Atmospherics | condensate drain | |
IN2021_V01 | 2021-02-03 18:51 [view ] | -56.8175 | 123.1698 | SMPS [view] | Outage | Atmospherics | SMPS power cable shook loose in rough weather I am securing the power cable better and restarting the SMPS | |
IN2021_V01 | 2021-02-03 19:29 [view ] | -56.8833 | 123.0263 | SMPS [view] | Maintenance | Atmospherics | Butanol replenished | |
IN2021_V01 | 2021-02-03 20:13 [view ] | -56.9637 | 122.8575 | SMPS [view] | Start | Atmospherics | Starting SMPS after power cable became disconnected | |
IN2021_V01 | 2021-02-13 05:29 [view ] | -65.5230 | 55.0532 | SMPS [view] | Outage | Atmospherics | SMPS was unexpectedly in standby mode | |
IN2021_V01 | 2021-02-13 05:30 [view ] | -65.5232 | 55.0530 | SMPS [view] | Stop | Atmospherics | Turned off SMPS for impactor clean (inlet valve closed) | |
IN2021_V01 | 2021-02-13 08:15 [view ] | -65.5218 | 55.0545 | SMPS [view] | Start | Atmospherics | ||
IN2021_V01 | 2021-02-18 07:13 [view ] | -63.7127 | 60.0000 | SMPS [view] | Maintenance | Atmospherics | butanol replenished | |
IN2021_V01 | 2021-03-05 16:36 [view ] | -67.3302 | 74.7548 | SMPS [view] | Start | Atmospherics | Re-Started SMPS - No Data coming thorugh Software be-boot | |
IN2021_V01 | 2021-03-05 17:25 [view ] | -67.3040 | 74.9740 | SMPS [view] | Start | Atmospherics | Re-Started SMPS The SMPS instrument was in standby as displayed by the LCD display. Re-started the instrument from fron panel this time not just a software reboot. Graph data seems to be populating now | |
IN2021_V01 | 2021-03-19 03:19 [view ] | -57.0007 | 128.5167 | SMPS [view] | Start | Atmospherics | Starting SMPS after fault The SMPS stopped working (see attached screenshot) | |
IN2021_V02 | 2021-04-20 04:37 [view ] | -46.9567 | 142.4297 | SMPS [view] | Maintenance | Atmospherics | Butanol replenished | |
IN2021_V03 | 2021-05-02 01:10 [view ] | -42.8863 | 147.3388 | SMPS [view] | Maintenance | Atmospherics | Flow check issues Flow check after maintenance with gilibrator. 177 ccm. Removed impactors and flow increased to 277. Checked directly on CPC and it was around the same. Tried just having the preimpactor installed - 244 ccm Tried just having the impactor installed - 159 ccm. Swapped the critical orifices into the other housing and the low flow followed the critical orifice. So the issue is the impactor& 39;s critical orifice (1 x 0.4 mm). This is the one that had its o-ring replaced. Swapping o-rings to confirm the o-ring is the issue or not. Impactor with good o-ring still shows a low flow (160 ccm), so the issue is isolated to the actual orifice, not the o-ring. Since both impactors are still showing some flow reduction, I& 39;m cleaning them again in the ultrasonic bath. Cleaning out the ultrasonic bath properly (rinsing, wiping out with kimwipes), then using 1% triton X solution (in tap water) filled up with milliQ then run on delicate setting at 40oC for 10 minutes. | |
IN2021_V03 | 2021-05-13 07:30 [view ] | -29.6372 | 154.1477 | SMPS [view] | Stop | Atmospherics | SMPS shutdown following advice from shore. | |
IN2021_V03 | 2021-05-14 03:40 [view ] | -27.1460 | 155.3170 | SMPS [view] | Start | Atmospherics | started | |
IN2021_V03 | 2021-05-14 05:15 [view ] | -27.1535 | 155.2347 | SMPS [view] | Stop | Atmospherics | Shutdown following advise from shore | |
IN2021_V04 | 2021-06-28 05:34 [view ] | -12.4718 | 130.8468 | SMPS [view] | Start | Atmospherics | ||
IN2021_V04 | 2021-07-05 13:23 [view ] | -10.6258 | 105.8607 | SMPS [view] | Maintenance | Atmospherics | Butanol supply filled - butanol condensate emptied |