Please login if you have access to particular applications.
Event details
Voyage: | IN2021_T01 [details] |
Subject: | not connected properly - air leak ino aerosol systems |
When: | 2021-06-13 18:55:07 UTC - entered into Elog/Everlog as 2021-06-13 18:55:07 |
Log: | in2021_t01/Atmospherics |
Equipment: | SMPS
nano Scanning Mobility Particle Sizer (Grimm) [view] |
Position: |
Latitude: -19.09117 Longitude: 149.91117
- entered into Elog as 19 05.47 S, 149 54.67 E |
Action: | Fault |
Encoding: | HTML |
16/6 23: | 55. This will have affected the SMPS, and CPCs. It is possible that it will have affected the.nephelometer and CCNC. |
Comments: | 16/6 23:26 - I just found that the air inlet tube was not connected properly. air has been sucked into the sampling system since I connected up the SMPS on 13/6 18:55. This will have affected the SMPS, and CPCs. It is possible that it will have affected the.nephelometer and CCNC. It is possible, but I think unlikely, that it also affected the ozone and greenhouse gas system, depending on the interactions in the manifold and sample lines. |