Please login if you have access to particular applications.
Event details
Voyage: | IN2020_V10 [details] |
Subject: | Triaxus electrical supply wire disconnected at the termination |
When: | 2020-11-19 19:34:00 UTC - entered into Elog/Everlog as 2020-11-19 19:34:00 |
Log: | in2020_v10 |
Equipment: | Triaxus
TRIAXUS Underway Profiling CTD [view] |
Position: |
Latitude: -43.44983 Longitude: 147.93733
- entered into Elog as 43 26.99 S, 147 56.24 E |
Action: | Fault |
Encoding: | HTML |
Comments: | Package retrieved for repair and testing. Apparently the connector locking mechanism had come lose and the plug disconnected |