Data Trawler - Event Details

Please login if you have access to particular applications.
Username:
Password:

Event details

Voyage: IN2020_V10       [details]
Subject: Triaxus electrical supply wire disconnected at the termination
When: 2020-11-19 19:34:00 UTC

- entered into Elog/Everlog as 2020-11-19 19:34:00
Log: in2020_v10
Equipment: Triaxus

TRIAXUS Underway Profiling CTD [view]
Position: Latitude: -43.44983 Longitude: 147.93733

- entered into Elog as 43 26.99 S, 147 56.24 E
Action: Fault
Encoding:HTML
Comments:

Package retrieved for repair and testing. Apparently the connector locking mechanism had come lose and the plug disconnected

NCMI Information and Data Centre  »  Applications  »  Data Trawler