Please login if you have access to particular applications.
Event details
Voyage: | IN2015_E01 [details] |
Subject: | Nano & Long SMPS |
When: | 2015-02-05 10:46:32 UTC - entered into Elog/Everlog as 2/5/2015 01:47 UTC |
Log: | IN2015_e01 |
Equipment: | Other
Profiling Lagrangian Acoustic Optical System [view] |
Station/Location: | aerosol lab |
Position: | Position not recorded in Elog/Everlog. |
Action: | Air Sampling |
Event time: | 47 UTC |
Programs restarted, stopped again to reconnect line, then started at about 02: | 45 on sample numbers 2492 (long) and 2552 (nano) |
Comments: | Nano & Long SMPS programmes stopped on sample numbers 2491 (long) and 2551 (nano) for flow checks. Problems with gilibrator used for flow checks. Programs restarted, stopped again to reconnect line, then started at about 02:45 on sample numbers 2492 (long) and 2552 (nano) Nano SMPS sheath and excess lines reconfigured so they're the same as the long SMPS |