Please login if you have access to particular applications.
Event details
Voyage: | IN2016_V05 [details] | ||
Subject: | Removed inlet drier | ||
When: | 2016-10-12 00:30:00 UTC - entered into Elog/Everlog as 2016-10-12 00:30:00 | ||
Log: | in2016_v05 | ||
Equipment: | Aerosol Lab
Aerosol Sampling Laboratory [view] | ||
Position: | Latitude: -18.4443 Longitude: 146.6754 Position from underway logging | ||
Action: | Air Sampling | ||
| |||
Comments: | 00:30 12/10/2016 UTC - 00:45 12/10/2016 UTC. Trying to resolve variable CPC/SMPS concentrations when the filter pump turns on/off. Removed inlet drier, suspect it could be leaking (turned out not to be the case -> there was an issue with back flow through the Neph). |