Please login if you have access to particular applications.
Event details
Voyage: | IN2016_V03 [details] | ||
Subject: | No Diff corrections | ||
When: | 2016-05-13 15:53:17 UTC - entered into Elog/Everlog as 2016-05-13 15:53:17 | ||
Log: | in2016_v03 | ||
Equipment: | GPS | ||
Position: | Latitude: -57.9991 Longitude: -170.0061 Position from underway logging | ||
Action: | Fault | ||
| |||
Comments: | Bridge reports no differential corrections have been coming through on either Seapath or one of the bridge systems. Bridge system has been down for days, seapath has been down for 1 day. Bridge has not notified SIT until now as we had been predisposed with CTD operations. DPS112 reset |