Data Trawler - Event Details

Information: - Our applications will be disrupted from 2024-05-03 16:30 AEST to 2024-05-03 18:00 AEST Friday due to infrastructure upgrades. We apologize for any inconvenience and appreciate your patience during this maintenance window.
Please login if you have access to particular applications.
Username:
Password:

Event details

Voyage: IN2016_V03       [details]
Subject: peristaltic pump swapped
When: 2016-04-29 22:28:43 UTC

- entered into Elog/Everlog as 2016-04-29 22:28:43
Log: in2016_v03
Equipment: Aerosol Lab

Aerosol Sampling Laboratory [view]
Position: Latitude: -55.5099 Longitude: 158.2691 Position from underway logging
Action: Air Sampling
Comments:

The water trap peristaltic pump has been swapped out. Some lab air may have contaminated the sample air for instruments connected to the main air sample line in the last 15 minutes.

NCMI Information and Data Centre  »  Applications  »  Data Trawler