Please login if you have access to particular applications.
Event details
| Voyage: | IN2016_V03 [details] |
| Subject: | CCNC checks |
| When: | 2016-05-21 02:07:00 UTC - entered into Elog/Everlog as 2016-05-21 02:07 |
| Log: | Atmos_in2016_v03 |
| Equipment: | Other
Profiling Lagrangian Acoustic Optical System [view] |
| Position: | Latitude: -46.3275 Longitude: -171.3758 Position from underway logging |
| Action: | Flow check |
| ;CCNc sampling line disconnected & capped. Flow & zero checks performed. Sampling line reconnected at 2: | 13UTC |
| Comments: | CCNc sampling line disconnected & capped. Flow & zero checks performed. Sampling line reconnected at 2:13UTC |