Please login if you have access to particular applications.
Event details
| Voyage: | IN2020_V09 [details] | ||
| Subject: | Changed over to ship power from shore | ||
| When: | 2020-08-25 22:30:00 UTC - entered into Elog/Everlog as 2020-08-25 22:30:00 | ||
| Log: | GSM_in2020_v09 | ||
| Equipment: | Other
Profiling Lagrangian Acoustic Optical System [view] | ||
| Position: |
Latitude: -42.88633 Longitude: 147.33883
- entered into Elog as 42 53.18 S, 147 20.33 E | ||
| |||
| Comments: | With the new UPS batteries installed there was no noticable PC/System shutdowns, other than the monitors, during the power transition. | ||