Data Trawler - Survey Details

Please login if you have access to particular applications.
Username:
Password:

Voyage details and related metadata, reports, events and data.

IN2017_E03    - is a Marine National Facility voyage

Title: Brisbane Port Period Sea Trials

Voyage details on MNF site: https://mnf.csiro.au/en/Voyages/IN2017_E03

Period: 2017-08-20 07:00 to 2017-08-23 08:30 UTC

Duration: 3.06 days

From: Brisbane To: Brisbane

Region: Queensland coast central

Ship: Investigator (RV) [details]

Description: RV Investigator research voyage in2017_e03, titled "Brisbane Port Period Sea Trials." The primary objective was to complete sea trials of onboard equipment as described in the Voyage Plan.

Leader: Stephen McCullum (voyage manager)

Project: Investigator - general vessel operations, gear trials, etc. [details] Primary


Voyage extents: 27° 23.0' S to 26° 24.4' S    153° 08.9' E to 154° 36.8' E Get voyage track shapefile Get CSV


Marlin Metadata:-

  • RV Investigator Radon Data - Selected Voyages (2014 onwards) [details]

  • RV Investigator Underway UWY Data (Unprocessed) [details]

  • RV Investigator Voyage IN2017_E03 EK60 Echosounder [details]

  • RV Investigator Voyage IN2017_E03 EM122 Multibeam Echosounder Data [details]

  • RV Investigator Voyage IN2017_E03 EM710 MKII Multibeam Echosounder Data [details]

  • RV Investigator Voyage IN2017_E03 End of Voyage (EOV) Archive [details]

  • RV Investigator Voyage IN2017_E03 ME70 Multibeam Fisheries Echosounder Data [details]

  • RV Investigator Voyage IN2017_E03 Underway UWY Data (Unprocessed) [details]

  • RV Investigator Voyage IN2017_E03 XBT Data [details]

  • Cruise Summary Report at SeaDataNet:-

  • View Cruise Summary Report at https://csr.seadatanet.org
  • Participants - on ship:-

    NameRoleOrganisation Project
    Mark Scanlon Deputy Voyage Manager Marine National Facility Voyage Management on RV Investigator
    Stephen McCullum Voyage Manager Marine National Facility Voyage Management on RV Investigator

    This list includes those that may have only been on part of the voyage. See voyage reports on 'Reports and Maps' tab for details.

    Marine National Facility Reports - plans, summaries and data processing

    Search for publications, reports and datasets from this and other voyages

    Data publishing

    This is a list of online datasets hosted by CSIRO. Other processed datasets hosted by collaborating organisations may be found on the 'Metadata' or "Reports, Publications and Maps' tab.
    Use the Get data link on the right to extract data using the NCMI Data Trawler.

    Data StreamData SummaryGet data
    Multibeam echosounder
    Time (UTC): 2017-08-20 08:08 to 2017-08-23 22:08
    Latitude: -27.25 to -26.41
    Longitude: 153.18 to 154.61
    Datafiles: 86
    Total size: 2.99 Gb
    Get Data from Trawler

    Radon measurements
    Time (UTC): 2017-08-21 00:00 to 2017-08-23 23:00
    Latitude: -27.09 to -26.41
    Longitude: 153.18 to 154.60
    Measurements:72
    Get Data from Trawler

    Download RV Investigator Radon dataset (XLSX)

    Singlebeam echosounder
    Time (UTC): 2017-08-20 05:43 to 2017-08-23 23:46
    Latitude: -27.45 to -26.41
    Longitude: 153.10 to 154.61
    Datafiles: 143
    Total size: 12.63 Gb
    Get Data from Trawler

    Geophysical Survey and Mapping acquisition report

    Underway No data
    XBT Profile
    Time (UTC): 2017-08-21 14:08 to 2017-08-23 15:08
    Latitude: -26.83 to -26.55
    Longitude: 153.79 to 154.48
    Quantity: 6 Casts
    Max Pressure: 1100.3 db
    Get Data from Trawler

    Caveat: this event log was authored on the voyage using either a standalone logging system called ELOG or more recently an inhouse event logging tool called Everlog. For this reason, some positions are unknown and may be resolved using the logged time and the underway dataset for the voyage.

    Search for events from this voyage and others

    Events ordered by start time:- Click on column header to sort. Use link on 'When' to see full details. Use the CSV button at the bottom to export data.

    When (UTC) LatitudeLongitude InstrumentIdentifierActionLogSubject / Comments
    2017-08-21 02:43 [view ] -26.8308 154.5965 EM122 [view] SVP GSM_in2017_e03 New SVP applied in2017_e03.asvp SST= 23.3 (in SVP builder, actual SST =23C)
    2017-08-21 02:44 [view ] -26.8317 154.5965 ME70 [view] Start GSM_in2017_e03 ME70 testing various configurations for interference
    2017-08-21 05:32 [view ] -26.7900 154.4657 EM122 [view] Stop GSM_in2017_e03
    2017-08-21 06:18 [view ] -26.7905 154.4653 EM122 [view] Start GSM_in2017_e03
    2017-08-21 14:59 [view ] -26.8335 154.4900 XBT [view] Drop GSM_in2017_e03 XBT drop 1 SST= 23.017
    2017-08-21 15:00 [view ] -26.8328 154.4890 EM122 [view] SVP GSM_in2017_e03 New SVP applied in2017_e03_xbt_001a.asvp
    2017-08-21 15:06 [view ] -26.8385 154.4905 EM122 [view] Start GSM_in2017_e03 Start roll cal line 1 Heading 114
    2017-08-21 15:42 [view ] -26.8668 154.5123 EM122 [view] Start GSM_in2017_e03 Start roll cal line 2 Heading 323
    2017-08-21 16:37 [view ] -26.8073 154.5253 EM122 [view] Start GSM_in2017_e03 Start cal line 3 HDG 114 Beam angles 60/60
    2017-08-21 17:13 [view ] -26.8418 154.5542 EM122 [view] Start GSM_in2017_e03 Start cal line 3 HDG 322
    2017-08-21 19:58 [view ] -26.7437 154.3887 EM122 [view] Stop GSM_in2017_e03 Stop on CTD station
    2017-08-22 09:37 [view ] -26.4440 154.3242 EM122 [view] Start GSM_in2017_e03
    2017-08-22 14:28 [view ] -26.5610 154.3378 XBT [view] GSM_in2017_e03 XBT drop 2
    2017-08-22 14:28 [view ] -26.5613 154.3375 EM122 [view] SVP GSM_in2017_e03 New SVP applied in2017_e03_xbt002.asvp
    2017-08-22 14:35 [view ] -26.5632 154.3275 EM122 [view] Start GSM_in2017_e03 Offset values zeroed in SIS
    2017-08-22 14:38 [view ] -26.5648 154.3200 EM122 [view] Start GSM_in2017_e03 Start yaw calibration line 1 HDG 257 Max beam angles 60/60 Speed 6 kts Beam spacing HDEQUDST
    2017-08-22 15:04 [view ] -26.5697 154.2740 EM122 [view] Other GSM_in2017_e03 Pitch stabliization off
    2017-08-22 15:17 [view ] -26.5455 154.2667 EM122 [view] Start GSM_in2017_e03 Start pitch line 1 HDG 345
    2017-08-22 15:47 [view ] -26.4968 154.2537 EM122 [view] GSM_in2017_e03 Pitch stabilization on
    2017-08-22 15:54 [view ] -26.4927 154.2655 EM122 [view] GSM_in2017_e03 Start yaw calibration line 2 HDG 64
    2017-08-22 16:29 [view ] -26.4833 154.3132 EM122 [view] Start GSM_in2017_e03 Start yaw calibration line 2 HDG 266
    2017-08-22 16:57 [view ] -26.4938 154.2597 EM122 [view] GSM_in2017_e03 Pitch stabliization off
    2017-08-22 17:04 [view ] -26.5048 154.2542 EM122 [view] GSM_in2017_e03 Start pitch line 2/yaw line 3 HDG 169
    2017-08-22 18:06 [view ] -26.4845 154.3415 EM122 [view] Start GSM_in2017_e03 Start yaw calibration line 4 HDG 168
    2017-08-22 23:20 [view ] -26.6652 154.5700 Techsas1 [view] in2017_e03 Reset after GUI freeze
    2017-08-22 23:20 [view ] -26.6650 154.5697 Techsas2 [view] restarted in2017_e03 Reset after GUI freeze
    2017-08-23 05:16 [view ] -26.5409 154.2558 EM122 [view] Start GSM_in2017_e03
    2017-08-23 14:33 [view ] -26.6388 153.9030 EM710 [view] Other GSM_in2017_e03 Offset values zeroed in SIS, pitch stabliization off
    2017-08-23 15:15 [view ] -26.7006 153.7734 XBT [view] GSM_in2017_e03 XBT drop 3, one failed
    2017-08-23 15:15 [view ] -26.7006 153.7699 EM710 [view] SVP GSM_in2017_e03 New SVP applied in2017_e03_xbt003.asvp
    2017-08-23 15:15 [view ] -26.7006 153.7699 EM122 [view] SVP GSM_in2017_e03 New SVP applied in2017_e03_xbt003.asvp
    2017-08-23 15:19 [view ] -26.7007 153.7568 EM122 [view] Stop GSM_in2017_e03 Stop for EM710 calibration
    2017-08-23 15:21 [view ] -26.7007 153.7521 EM710 [view] Start GSM_in2017_e03 At calibration site
    2017-08-23 15:43 [view ] -26.7008 153.7215 EM710 [view] GSM_in2017_e03 Dual swath mode off
    2017-08-23 15:46 [view ] -26.7010 153.7260 EM710 [view] Start GSM_in2017_e03 Start Cal line 1 (pitch1/roll1/yaw1) HDG 92 Beam angles 60/60 HD EQUDST Dual swath off, pitch stabilization off 40-100kHz
    2017-08-23 16:11 [view ] -26.7008 153.7494 EM710 [view] Start GSM_in2017_e03 Start Cal line 2 (pitch2/roll2) HDG 268
    2017-08-23 16:33 [view ] -26.6901 153.7331 EM710 [view] Start GSM_in2017_e03 Start cal line 3 (yaw2) HDG 93
    2017-08-23 16:54 [view ] -26.6898 153.7461 EM710 [view] Start GSM_in2017_e03 Start Cal line 4- additional line HDG 271
    2017-08-23 22:42 [view ] -27.0414 153.2586 EM710 [view] GSM_in2017_e03 Stop logging
    2017-08-23 22:43 [view ] -27.0429 153.2625 EK60 [view] Stop GSM_in2017_e03 Stop pinging

    Save this list as

    Deployments by start time:- Click on column header to sort. Use link on 'Deployment' to see full details. Use the CSV button at the bottom to export data (tab delimited).

    Search for deployments from this voyage and others

    Deployment OperationStationCastGearProject Start and end timesStart LocationEnd LocationDepthDescription
    XBT Cast [details]   Sippican Deep Blue 2548 2017-08-22 00:49 1100.3
    XBT Cast [details]   Sippican Deep Blue 2548 2017-08-23 00:22 1100.3
    XBT Cast [details]   Sippican Deep Blue 2548 2017-08-24 01:04 875
    XBT Cast [details]   Sippican Deep Blue 2548 2017-08-24 01:06 66
    XBT Cast [details]   Sippican Deep Blue 2548 2017-08-24 01:07 23.4
    XBT Cast [details]   Sippican Deep Blue 2548 2017-08-24 01:09 1100.3

    Save this list as

    NCMI Information and Data Centre  »  Applications  »  Data Trawler