Please login if you have access to particular applications.
Event details
Voyage: | IN2019_V07 [details] |
When: | 2019-04-16 05:38:23 UTC - entered into Elog/Everlog as 2019-04-16 05:38:23 |
Log: | Coring_in2019_v07 |
Equipment: | Multi Core |
Position: |
Latitude: -38.136 Longitude: 148.76983
- entered into Elog as 38 08.16 S, 148 46.19 E |
Action: | Deploy |
Depth: | 116 |
Comments: | Acoustic release loaded without damper connected. USBL : worked Release : worked Touched down at arround 124 2min on bottom |