214  TECHNICAL PAGE:

CSIRO Marine and Atmospheric Research Australia.   Web Page Last Updated: 05-Oct-2009 19:31:36

Current Float Status:   DEAD?

Return to Index Page

- 209 - 210 - 211 - 212 - 213 - 214 - 215 - 279 - 280 - 281 - 301

 

META DATA:

Latest Profiler Status:

 

Mission Programming:

 
 Current Float Status ACTIVE  Positioning System: ARGOS
 Date of Last Transmission: 02/09/2005  Battery Configuration: ?
 Anomaly:  Argos Transmission Frequency:  
 Latest Park Battery Voltage: ?  Argos Repetition Period (seconds) 99999
 Number of Profiles: ?  Transmission System ID: 02274
 Operational Problems/Issues -  Cycle Time (Hours) 240
 End Mission Date: 02/09/2005 Time: 08:01:41  Up Time (Hours) 99999
 End Mission Status T  Down Time (Hours) 99999

Profiler Identification IDs

   Park Depth (dbars) 2000
 Hull ID: 214  Profile Depth (dbars) 2000
 WMO Platform ID: 1900141  Firmware Revision / Date ?
 Argos ID / ICCID ARGOS PTT ID: 07494

Deployment Information:

 
 Platform/Instrument Manufacturer: MARTEC  Deployment Latitude, Longitude Lat: 8 Lon: -16.17
 Instrument Reference MARTEC-FSI OIN 02-F214  Deploy Mission:  
 CPU APF8/9 Serial Number ?  Deployment Ship/By:  
 WMO Instrument Type 842  Date of Deployment: 14/02/2003 Time: 00:00:00
 SBE  CTD Type / Serial Number: ?  Deployment Issues/Problems: 1

Sensor Information:

     
 TEMPERATURE TEMP Units:(Celsius_degrees) MODEL/SN: [ FSI] Accuracy:0.05 Resolution:0.001
 CONDUCTIVITY -
 PRESSURE PRES Units:(dbar) MODEL/SN: [ FSI] Accuracy:10 Resolution:1
 OXYGEN -
 
 
TECHNICAL PROBLEMS AND ISSUES:
Comments  
Failure Mode:  
Failure Mode Description:  
Technical Problems and Issues  
 
ENGINEERING DATA:
[ENGINEERINGTABLE]  
   
ENGINEERING PLOTS:

 

BATHYMETRY:

 No:  Tx DATE:   LATITUDE:  LONGITUDE  DEPTH  PARK:  PROF:  Gnd
     dd/mm/yyyy  (degrees)  (degrees)  Bathy  Press  Press  Y/N

 

TRAJECTORY:

 

External Links:

[PROFILELINK]